Remote Sensing of Deformation of a High Concrete-Faced Rockfill Dam Using InSAR: A Study of the Shuibuya Dam, China

被引:32
|
作者
Zhou, Wei [1 ]
Li, Shaolin [1 ]
Zhou, Zhiwei [2 ]
Chang, Xiaolin [1 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Peoples R China
[2] Wuhan Univ, Global Nav Satellite Syst Res Ctr, Wuhan 430079, Peoples R China
基金
中国国家自然科学基金;
关键词
Shuibuya; in-situ measurement; time series analysis; ALOS/PALSAR; Concrete Face Rockfill Dam; InSAR; settlement monitoring; RADAR ATMOSPHERIC CORRECTION; SAR INTERFEROMETRY; GPS; INTEGRATION; MOTION;
D O I
10.3390/rs8030255
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Settlement is one of the most important deformation characteristics of high concrete faced rockfill dams (CFRDs, >100 m). High CFRDs safety would pose a great threat to the security of people's lives and property downstream if this kind of deformation were not to be measured correctly, as traditional monitoring approaches have limitations in terms of durability, coverage, and efficiency. It has become urgent to develop new monitoring techniques to complement or replace traditional monitoring approaches for monitoring the safety and operation status of high CFRDs. This study examines the Shuibuya Dam (up to 233.5 m in height) in China, which is currently the highest CFRD in the world. We used space-borne Interferometric Synthetic Aperture Radar (InSAR) time series to monitor the surface deformation of the Shuibuya Dam. Twenty-one ALOS PALSAR images that span the period from 28 February 2007 to 11 March 2011 were used to map the spatial and temporal deformation of the dam. A high correlation of 0.93 between the InSAR and the in-situ monitoring results confirmed the reliability of the InSAR method; the deformation history derived from InSAR is also consistent with the in-situ settlement monitoring system. In addition, the InSAR results allow continuous investigation of dam deformation over a wide area that includes the entire dam surface as well as the surrounding area, offering a clear picture continuously of the dam deformation.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Study of dam deformation control method for Shuibuya high concrete faced rockfill dam
    Yang Qi-gui
    Chang Xiao-lin
    Zhou Chuang-bing
    Zhou Wei
    ROCK AND SOIL MECHANICS, 2010, 31 : 247 - 253
  • [3] Creep analysis of high concrete-faced rockfill dam
    Zhou Wei
    Chang Xiaolin
    Zhou Chuangbing
    Liu Xinghong
    INTERNATIONAL JOURNAL FOR NUMERICAL METHODS IN BIOMEDICAL ENGINEERING, 2010, 26 (11) : 1477 - 1492
  • [4] No-linear and elasto-plastic analysis for high concrete-faced rockfill dam of Shuibuya Project
    Liu, Songtao
    Cheng, Zhanlin
    Chen, Yun
    Ren, Zhiwei
    Changjiang Kexueyuan Yuanbao/ Journal of Yangtze River Scientific Research Institute, 1999, 16 (01): : 26 - 28
  • [5] Shuibuya: The world's highest concrete faced rockfill dam
    Yue, Zhongming
    Yang, Qing
    International Journal on Hydropower and Dams, 2000, 7 (04): : 94 - 97
  • [6] ANISOTROPIC SEEPAGE ANALYSIS OF A CONCRETE-FACED ROCKFILL DAM
    Song, Fei
    Zhang, Ga
    Zhang, Jianmin
    RECENT DEVELOPMENT OF GEOTECHNICAL AND GEO-ENVIRONMENTAL ENGINEERING IN ASIA, PROCEEDINGS, 2006, : 403 - 406
  • [7] Design and construction of the Segredo concrete-faced rockfill dam
    Neidert, S.H.
    Toniatti, N.B.
    International Water Power and Dam Construction, 1991, 43 (01): : 15 - 19
  • [8] Deformation and stress ananlysis of concrete-faced rockfill dam of Taoshui Reservoir project
    Yu Wei-ming
    She Cheng-xue
    ROCK AND SOIL MECHANICS, 2007, 28 : 338 - 342
  • [9] Long-Term Deformation Analysis of the Jiudianxia Concrete-Faced Rockfill Dam
    Lei Gan
    Zhen-zhong Shen
    Li-qun Xu
    Arabian Journal for Science and Engineering, 2014, 39 : 1589 - 1598
  • [10] Long-Term Deformation Analysis of the Jiudianxia Concrete-Faced Rockfill Dam
    Gan, Lei
    Shen, Zhen-zhong
    Xu, Li-qun
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2014, 39 (03) : 1589 - 1598