OPTIMIZATION STRATEGIES TO ELIMINATE INTERFACE CONFLICTS IN COMPLEX SUPPLY CHAINS OF CONSTRUCTION PROJECTS

被引:34
作者
Ju, Qianqian [1 ,2 ]
Ding, Lieyun [1 ]
Skibniewski, Miroslaw J. [2 ,3 ,4 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Civil Engn & Mech, Wuhan 430074, Hubei, Peoples R China
[2] Univ Maryland, Dept Civil & Environm Engn, College Pk, MD 20742 USA
[3] Polish Acad Sci, Inst Theoret & Appl Informat, Gliwice, Poland
[4] Chaoyang Univ Technol, Taichung, Taiwan
关键词
construction industry; interface management; project management; supply chain; integration; conflict; IPD; MANAGEMENT;
D O I
10.3846/13923730.2016.1232305
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The supply chains of complex construction projects are characterized by multi-disciplinary participants, adversarial short-term relationships and fragmentations in project delivery procedures. Multi-disciplinary participants tend to make decisions on project activities based on their own objectives and value systems independently with little regard of holistic project performance. The lack of common values results in a limited understanding of how behaviors of one discipline impact on the related disciplines. This has led to tons of interface conflicts which ultimately affect project effectiveness. This paper investigates this problem by discussing Interface Value for the core players to understand the value-driven behaviors on the boundaries among owner and multiple prime contractors in complex construction projects. Two types of interface conflicts are recognized and defined. Value Optimization Strategy is proposed under status quo delivery methods by adjusting and reallocating interface responsibilities between related contractors. Improvements of procurement procedures are the key solutions to interface conflicts. Prospects of integrated project delivery (IPD) in eliminating interface conflicts are also discussed. The paper concludes that Value Optimization Strategy and IPD-based approach are expected to eliminate interface conflicts of complex construction projects, integrate the complex supply chain and lower the potential risks for project delivery delay and cost overrun.
引用
收藏
页码:712 / 726
页数:15
相关论文
共 27 条
  • [1] Al-Hammad A.M., 2000, J PERFORM CONSTR FAC, V14, P71, DOI [10.1061/(asce)0887-3828(2000)14:2(71), DOI 10.1061/(ASCE)0887-3828(2000)14:2(71)]
  • [2] Al-Hammed A., 1995, J PERFORM CONSTR FAC, V9, P194, DOI [10.1061/(asce)0887-3828(1995)9:3(194), DOI 10.1061/(ASCE)0887-3828(1995)9:3(194)]
  • [3] [Anonymous], 1994, 4183 ASNZS
  • [4] Is the construction industry aware of supply chain management? The Portuguese contractors' perspective
    Arantes, Amilcar
    Ferreira, Luis Miguel D. F.
    Costa, Antonio Aguiar
    [J]. SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2015, 20 (04) : 404 - 414
  • [5] Ballard G., 1995, LEAN CONSTRUCTION, V2, P291
  • [6] Dainty A., 2001, CONSTR MANAG ECON, V19, P841, DOI DOI 10.1080/01446190110089727
  • [7] Emmitt S., 2005, Proc. 13th Annual Conference on Lean Construction, IGLC, Sydney, P57
  • [8] Efficiency versus effectiveness in construction supply chains: the dangers of "lean" thinking in isolation
    Fearne, Andrew
    Fowler, Nicholas
    [J]. SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2006, 11 (04) : 283 - 287
  • [9] Gunasekaran A., 1998, Logistics Information Management, V11, P295, DOI 10.1108/09576059810234209
  • [10] Harrison P, 2004, PROCEEDINGS OF THE 2004 ASME/IEEE JOINT RAIL CONFERENCE, P89