Adaptive genetic algorithms for multi-resource constrained project scheduling problem with multiple modes

被引:0
|
作者
Kim, KwanWoo [1 ]
Gen, Mitsuo
Kim, Myounghun
机构
[1] Tokyo Metropolitan Inst Technol, Dept Intelligent Syst, Tokyo 1900065, Japan
[2] Waseda Univ, Grad Sch Informat Prod & Syst, Kitakyushu, Fukuoka 8080135, Japan
[3] Konkuk Univ, Dept Ind Engn, Seoul 143701, South Korea
来源
INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL | 2006年 / 2卷 / 01期
关键词
multi-resource constrained; project scheduling problem; multiple modes; adaptive genetic algorithm;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In modern manufacturing systems like multi-resource constrained project scheduling problem with the multiple modes (mcPSP-mM) is complicated because of the complex interrelationships between the units of the different stages. In this paper, we develop an adaptive genetic algorithm (aGA) to solve the mcPSP-mM which is a well known NP-hard problem. A new aGA algorithm approach for solving these mcPSP-mM problems is 1) the design of priority-based encoding for activity priority and multistage-based encoding for activity mode, 2) order-based crossover operator for activity priority and local search-based mutation operator for activity mode, 3) iterative hill-climbing method in GA loop, 4) auto-tuning for the rates of crossover and mutation operators. The numerical experiments show that the proposed aGA is effective to the mcPSP-mM.
引用
收藏
页码:41 / 49
页数:9
相关论文
共 50 条
  • [31] On the performance of bee algorithms for resource-constrained project scheduling problem
    Ziarati, Koorush
    Akbari, Reza
    Zeighami, Vahid
    APPLIED SOFT COMPUTING, 2011, 11 (04) : 3720 - 3733
  • [32] Problem space search algorithms for resource-constrained project scheduling
    Naphade, KS
    Wu, SD
    Storer, RH
    ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) : 307 - 326
  • [33] Scheduling Multi-Resource Satellites using Genetic Algorithms and Permutation Based Representations
    De Carvalho, O. Quevedo
    Whitley, D.
    Shetty, V.
    Jampathom, P.
    Roberts, M.
    PROCEEDINGS OF THE 2023 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, GECCO 2023, 2023, : 1473 - 1481
  • [34] An integrated model for multi-resource constrained scheduling problem considering multi-product and resource-sharing
    Liu, Changchun
    Xiang, Xi
    Zheng, Li
    Ma, Jing
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (19) : 6491 - 6511
  • [35] ALGORITHMS FOR THE MULTI-RESOURCE GENERALIZED ASSIGNMENT PROBLEM
    GAVISH, B
    PIRKUL, H
    MANAGEMENT SCIENCE, 1991, 37 (06) : 695 - 713
  • [36] Randomized Algorithms for Scheduling Multi-Resource Jobs in the Cloud
    Psychas, Konstantinos
    Ghaderi, Javad
    IEEE-ACM TRANSACTIONS ON NETWORKING, 2018, 26 (05) : 2202 - 2215
  • [37] Resource-constrained project scheduling problem with multiple execution modes and fuzzy/crisp activity durations
    Atli, Omer
    Kahraman, Cengiz
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2014, 26 (04) : 2001 - 2020
  • [38] Optimization of Resource-Constrained Multi-Project Scheduling Problem based on the genetic algorithm
    Shu, Xin
    Su, Qiang
    Wang, Qian
    Wang, Qiugen
    2018 15TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2018,
  • [39] Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times
    Suresh, M.
    Dutta, Pankaj
    Jain, Karuna
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2015, 32 (06)
  • [40] A genetic algorithm for mode identity and the resource constrained project scheduling problem
    Afshar-Nadjafi, Behrouz
    Rahimi, Amir
    Karimi, Hamid
    SCIENTIA IRANICA, 2013, 20 (03) : 824 - 831