An Algorithm for Rescheduling of Trains under Planned Track Closures

被引:4
作者
Filcek, Grzegorz [1 ]
Gasior, Dariusz [1 ]
Hojda, Maciej [1 ]
Jozefczyk, Jerzy [1 ]
机构
[1] Wroclaw Univ Sci & Technol, Fac Comp Sci & Management, Dept Comp Sci & Syst Engn, 27 Wyb Wyspianskiego St, PL-50370 Wroclaw, Poland
来源
APPLIED SCIENCES-BASEL | 2021年 / 11卷 / 05期
关键词
railway transportation; timetable; track closure; rescheduling; optimization; simulation; INFRASTRUCTURE MAINTENANCE; OPTIMIZATION MODEL; RAIL NETWORKS; OPERATIONS;
D O I
10.3390/app11052334
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
This work considered a joint problem of train rescheduling and closure planning. The derivation of a new train run schedule and the determination of a closure plan not only must guarantee the satisfaction of all the given constraints but also must optimize the number of accepted closures, the number of approved train runs, and the total time shift between the resultant and the original schedule. Presented is a novel nonlinear mixed integer optimization problem which is valid for a broad class of railway networks. A multi-level hierarchical heuristic algorithm is introduced due to the NP-hardness of the considered optimization problem. The algorithm is able, on an iterative basis, to jointly select closures and train runs, along with the derivation of a train schedule. Results obtained by the algorithm, launched for the conducted experiments, confirm its ability to provide acceptable and feasible solutions in a reasonable amount of time.
引用
收藏
页码:1 / 41
页数:41
相关论文
共 62 条
[21]   Maintaining tracks and traffic flow at the same time [J].
Forsgren, Malin ;
Aronsson, Martin ;
Gestrelius, Sara .
JOURNAL OF RAIL TRANSPORT PLANNING & MANAGEMENT, 2013, 3 (03) :111-123
[22]  
GONZAGA CC, 1995, RESENHAS IME USP, V2, P197
[23]  
Goverde R.M., 2015, P 6 INT C RAILW OP M
[24]   Modeling Network Transition Constraints with Hypergraphs [J].
Harrod, Steven .
TRANSPORTATION SCIENCE, 2011, 45 (01) :81-97
[25]   High-Speed Rail Train Timetabling Problem: A Time-Space Network Based Method with an Improved Branch-and-Price Algorithm [J].
He, Bisheng ;
Song, Rui ;
He, Shiwei ;
Xu, Yue .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
[26]   Mixed integer programming for minimizing the period of a cyclic railway timetable for a single track with two train types [J].
Heydar, Mojtaba ;
Petering, Matthew E. H. ;
Bergmann, Dietrich R. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 66 (01) :171-185
[27]   Scheduling of railway track maintenance activities and crews [J].
Higgins, A .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (10) :1026-1033
[28]  
Higgins A., 1999, P 14 INT S TRANSP TR
[29]   A Joint Problem of Track Closure Planning and Train Run Rescheduling with Detours [J].
Hojda, Maciej ;
Filcek, Grzegorz .
ADVANCES IN SYSTEMS SCIENCE, ICSS 2016, 2017, 539 :285-294
[30]   SCHEDULING AROUND A SMALL COMMON DUE DATE [J].
HOOGEVEEN, JA ;
VANDEVELDE, SL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 55 (02) :237-242