Multi Project Scheduling and Material Planning Using Lagrangian Relaxation Algorithm

被引:27
作者
Ahmed, Alim Al Ayub [1 ]
Dwijendra, Ngakan Ketut Acwin [2 ]
Bynagari, NareshBabu [3 ]
Modenov, A. K. [4 ]
Kavitha, M. [5 ]
Dudukalov, Egor [6 ]
机构
[1] Jiujiang Univ, Sch Accounting, Jiujiang, Jiangxi, Peoples R China
[2] Udayana Univ, Bali, Indonesia
[3] Career Soft Solut Inc, Middlesex, NJ USA
[4] St Petersburg State Univ Architecture & Civil Eng, St Petersburg, Russia
[5] Saveetha Univ, Saveetha Sch Engn, Saveetha Inst Med & Tech Sci, Chennai, Tamil Nadu, India
[6] Russian Presidential Acad, Natl Econ & Publ Adm, Moscow, Russia
来源
INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS | 2021年 / 20卷 / 04期
关键词
Resource-Constrained Multi Project Scheduling; Material Procurement; Lagrangian Relaxation Algorithm; CONSTRUCTION; MODEL;
D O I
10.7232/iems.2021.20.4.580
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Resource-constrained project scheduling is one of the well-known problems in project management. There are many cases where the appropriate schedule was determined first and material ordering plan was decided considering the given schedule. This approach ignores the interactions between these decisions. The integration of project scheduling, material procurement, and production planning of non-renewable resources leads to the coordination of project implementation and supplying resources. This coordination reduces total costs, including operating activities, production, ordering, holding, and penalty costs for late project completion. In addition to, there are many organizations that implement the multi project at the same time and decisions are made in a multi project environment. In this paper, a mixed integer programming model is presented for the resource-constrained multi-project scheduling problem and material ordering and production planning. Due to the application of Lagrangian relaxation algorithm in solving complex problems, this algorithm has been used to solve the proposed mathematical model. To evaluate the performance of the proposed model and solution method, a set of sample examples is solved and the numerical results are given. The findings of this paper show the good performance of the model and the solution method and can provide managerial insights for project managers and resource suppliers.
引用
收藏
页码:580 / 587
页数:8
相关论文
共 17 条
[1]  
Aquilano N.J., 1980, Journal of Operations Management, V1, P57
[2]   A hybrid genetic and Lagrangian relaxation algorithm for resource-constrained project scheduling under nonrenewable resources [J].
Chaleshtarti, Ali Shirzadeh ;
Shadrokh, Shahram ;
Khakifirooz, Marzieh ;
Fathi, Mahdi ;
Pardalos, Panos M. .
APPLIED SOFT COMPUTING, 2020, 94
[3]   Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival [J].
Chen, HaoJie ;
Ding, Guofu ;
Zhang, Jian ;
Qin, Shengfeng .
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
[4]   Understanding customer satisfaction in product customization [J].
Du, Xuehong ;
Jiao, Jianxin ;
Tseng, Mitchell M. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 31 (3-4) :396-406
[5]   Integrated scheduling and batch ordering for construction project [J].
Fu, Fang .
APPLIED MATHEMATICAL MODELLING, 2014, 38 (02) :784-797
[6]   A mathematical model for project scheduling and material ordering problem with sustainability considerations: A case study in Iran [J].
Habibi, Farhad ;
Barzinpour, Farnaz ;
Sadjadi, Seyed Jafar .
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 128 :690-710
[7]   A survey of variants and extensions of the resource-constrained project scheduling problem [J].
Hartmann, Soenke ;
Briskorn, Dirk .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) :1-14
[8]   Establishing Outsourcing and Supply Chain Plans for Prefabricated Construction Projects Under Uncertain Productivity [J].
Hsu, Pei-Yuan ;
Aurisicchio, Marco ;
Angeloudis, Panagiotis .
COMPUTATIONAL LOGISTICS, ICCL 2017, 2017, 10572 :529-543
[9]   Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem [J].
Kannimuthu, Marimuthu ;
Raphael, Benny ;
Ekambaram, Palaneeswaran ;
Kuppuswamy, Ananthanarayanan .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (04) :893-916
[10]   Quantitative approaches for the integration of production and distribution planning in the supply chain: a systematic literature review [J].
Kumar, Ramesh ;
Ganapathy, L. ;
Gokhale, Ravindra ;
Tiwari, Manoj Kumar .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (11) :3527-3553