Proactive Project Scheduling With Activity Splitting and Resource Transfer Times Under Uncertain Environments

被引:2
作者
Ma, Zhiqiang [1 ]
Ning, Minjing [2 ]
Wang, Yanting [3 ]
机构
[1] China Univ Petr, Sch Econ & Management, Qingdao 266580, Peoples R China
[2] Southwest Petr Univ, Sch Econ & Management, Chengdu 610500, Peoples R China
[3] Qingdao Univ Sci & Technol, Coll Econ & Management, Qingdao 266061, Peoples R China
关键词
Schedules; Robustness; Scheduling; Heuristic algorithms; Resource management; Genetic algorithms; Economics; Activity splitting; genetic algorithm; proactive scheduling; project scheduling; resource transfer time; TRADE-OFF; GENETIC ALGORITHM; STABILITY; ROBUSTNESS; ALLOCATION;
D O I
10.1109/ACCESS.2022.3196460
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Proactive project scheduling aims to generate robust baseline schedules that are protected against the potential schedule disruptions during project execution. In this paper, we propose a new problem named the proactive resource-constrained project scheduling problem with activity splitting and resource transfer times, and try to investigate the trade-off between the benefits of activity splitting and the drawbacks of the resulting more resource transfer times. The proposed problem is formulated into an integer programming model with considering the constraints of a maximum allowed number of splitting and a minimum period of continuous execution. Since the problem is NP-hard in the strong sense, a genetic algorithm is then developed for problem solving. From the obtained results of a designed computational experiment, we prove that the developed genetic algorithm is effective in solving the defined problem, and the benefits of activity splitting to schedule robustness improvement can be weaken with the resulting more resource transfer times among the subactivities. Besides, with the increase of the maximum allowed number of activity splitting, the decrease of the minimum continuous execution time, the decrease of resource transfer times, and the extension of project deadlines, schedule robustness increases.
引用
收藏
页码:87490 / 87499
页数:10
相关论文
共 44 条
[1]   A multi-agent system for decentralized multi-project scheduling with resource transfers [J].
Adhau, Sunil ;
Mittal, M. L. ;
Mittal, Abhinav .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 146 (02) :646-661
[2]   Pre-emption in resource-constrained project scheduling [J].
Ballestin, Francisco ;
Valls, Vicente ;
Quintanilla, Sacramento .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) :1136-1152
[3]   Scheduling projects with limited number of preemptions [J].
Ballestin, Francisco ;
Valls, Vicente ;
Quintanilla, Sacramento .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (11) :2913-2925
[4]   Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting [J].
Buddhakulsomsiri, Jirachai ;
Kim, David S. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 178 (02) :374-390
[5]   Linear programming based algorithms for preemptive and non-preemptive RCPSP [J].
Damay, Jean ;
Quilliot, Alain ;
Sanlaville, Eric .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 182 (03) :1012-1022
[6]   Proactive heuristic procedures for robust project scheduling: An experimental analysis [J].
de Vonder, Stijn Van ;
Demeulemeester, Erik ;
Herroelen, Willy .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) :723-733
[7]   Robust resource allocation decisions in resource-constrained projects [J].
Deblaere, Filip ;
Demeulemeester, Erik ;
Herroelen, Willy ;
Van de Vonder, Stijn .
DECISION SCIENCES, 2007, 38 (01) :5-37
[8]   An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources [J].
Delgoshaei, Aidin ;
Rabczuk, Timon ;
Ali, Ahad ;
Ariffin, Mohd Khairol Anuar .
ANNALS OF OPERATIONS RESEARCH, 2017, 259 (1-2) :85-117
[9]  
Demeulemeester E.L., 2002, Project Scheduling : A Research Handbook
[10]   An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem [J].
Demeulemeester, EL ;
Herroelen, WS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) :334-348