Program planning under uncertainty

被引:0
作者
Vaziri, Kabeh [1 ]
Carr, Paul [1 ]
Nozick, Linda [1 ]
机构
[1] Cornell Univ, Ithaca, NY 14853 USA
来源
PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5 | 2007年
关键词
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Task durations are subject to uncertainty and they can be influenced by the resources assigned. Commonly there is the opportunity to assign workers to tasks, which require a secondary skill they have. When workers use secondary skills, they are not as efficient as workers for which that skill is their primary skill, however they can contribute to the completion of the task. This paper provides the means for managers to heuristically optimize the allocation of their skilled workers among individual tasks on several competing projects when the task durations are uncertain and workers have multiple skills.
引用
收藏
页码:2098 / 2106
页数:9
相关论文
共 25 条
[1]   Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms [J].
Alcaraz, J ;
Maroto, C ;
Ruiz, R .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (06) :614-626
[2]   A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version [J].
Bouleimen, K ;
Lecocq, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) :268-281
[3]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[4]   A hybrid scatter search/electromagnetism meta-heuristic for project scheduling [J].
Debels, D ;
De Reyck, B ;
Leus, R ;
Vanhoucke, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 169 (02) :638-653
[5]  
DUNNE EJD, EUROPEAN J OPERATION, V81, P225
[6]  
Elmaghraby S.E., 1977, Activity Networks: Project Planning and Control by Network Models
[7]   Solving the resource-constrained project problem by a variable neighbourhood scheduling search [J].
Fleszar, K ;
Hindi, KS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 155 (02) :402-413
[8]   A heuristic for network project scheduling with random activity durations depending on the resource allocation [J].
Golenko-Ginzburg, D ;
Gonik, A .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1998, 55 (02) :149-162
[9]  
Hartmann S, 1998, NAV RES LOG, V45, P733, DOI 10.1002/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0.CO
[10]  
2-C