Maintenance scheduling;
Integrated models;
Lot sizing;
Non-cyclic maintenance;
Production planning;
LOT-SIZING PROBLEM;
PREVENTIVE MAINTENANCE;
PROCESS DETERIORATION;
MACHINE BREAKDOWNS;
SYSTEMS;
D O I:
10.1007/s10696-016-9244-8
中图分类号:
T [工业技术];
学科分类号:
08 ;
摘要:
It has been demonstrated that integrating maintenance scheduling and production planning can lead to substantial savings. However in these works the associated optimization problems are solved by enumerating all (exponentially many) maintenance schedules. This has led these researchers to either solve instances of very small sizes, or consider cyclic maintenance schedules only to limit the possibilities to a small (polynomial) number. We show here how to formulate these problems as (strong) mixed-integer linear programs, and then solve them using off-the-shelve MIP solvers. We demonstrate the efficiency of the proposed approach to solve problems of up to 10 products and 24 time periods, sizes that were simply unreachable before. We also illustrate the value of using non-cyclic maintenance schedules when the demand varies over time, with savings of up to 41 % compared to cyclic schedules.
机构:
Cranfield Univ, Sch Water Energy & Environm, Cranfield MK43 0AL, Beds, England
Univ Tekn Malaysia Melaka, Ctr Adv Res Energy, Durian Tunggal 76100, Melaka, MalaysiaCranfield Univ, Sch Water Energy & Environm, Cranfield MK43 0AL, Beds, England
Zulkafli, Nur I.
Kopanos, Georgios M.
论文数: 0引用数: 0
h-index: 0
机构:
Cranfield Univ, Sch Water Energy & Environm, Cranfield MK43 0AL, Beds, EnglandCranfield Univ, Sch Water Energy & Environm, Cranfield MK43 0AL, Beds, England
机构:
Univ Groningen, Fac Econ & Business, Dept Operat, POB 800, NL-9700 AV Groningen, NetherlandsUniv Groningen, Fac Econ & Business, Dept Operat, POB 800, NL-9700 AV Groningen, Netherlands