Prediction of TBM penetration rate using the imperialist competitive algorithm (ICA) and quantum fuzzy logic

被引:19
作者
Afradi, Alireza [1 ]
Ebrahimabadi, Arash [1 ]
机构
[1] Islamic Azad Univ, Qaemshahr Branch, Dept Min & Geol, Qaemshahr, Iran
关键词
Rock properties; Quantum; Tunnel boring machine; TBM; Fuzzy; Imperialist competitive algorithm; TUNNEL-BORING MACHINE; PARTICLE SWARM OPTIMIZATION; PERFORMANCE PREDICTION; ROCK; MODEL;
D O I
10.1007/s41062-021-00467-3
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Quantum computer brings many advantages to the world of computations. Also, the tunnel boring machine (TBM) has been industrialized over the prior decades to make the tunneling process safer and more affordable. Several factors such as economic considerations, rock properties, and schedule deadlines play an important role in the use of TBMs mining projects. Hence, future projects are interested in enhanced means for predicting the TBM performance. The TBM penetration is usually an essential factor for the prosperous implementation of a plan for tunneling in a rock situation. In this research, the statistical analyses of rock features and the measured penetration rate of TBMs are presented using the imperialist competitive algorithm (ICA) and quantum fuzzy logic. Also, a database has been used that includes the parameters of rock properties of the Queens Water Tunnel. The proposed hybrid method is applied to provide a new predictive model for improving TBM performance. Results demonstrated that this method has a high capability to predict the performance of TBM with R-2=0.93 and RMSE=0.09. This shows that the application of the proposed approach is preferable compared to the prior models in terms of penetration rate.
引用
收藏
页数:17
相关论文
共 66 条
[1]  
Abdechiri Marjan, 2010, 2010 9th IEEE International Conference on Cognitive Informatics (ICCI), P940, DOI 10.1109/COGINF.2010.5599776
[2]   Bayesian prediction of TBM penetration rate in rock mass [J].
Adoko, Amoussou Coffi ;
Gokceoglu, Candan ;
Yagiz, Saffet .
ENGINEERING GEOLOGY, 2017, 226 :245-256
[3]   PREDICTION OF TBM PENETRATION RATE USING SUPPORT VECTOR MACHINE [J].
Afradi, Alireza ;
Ebrahimabadi, Arash ;
Hallajian, Tahereh .
GEOSABERES, 2020, 11 :467-479
[4]   Prediction of tunnel boring machine penetration rate using ant colony optimization, bee colony optimization and the particle swarm optimization, case study: Sabzkooh water conveyance tunnel [J].
Afradi, Alireza ;
Ebrahimabadi, Arash ;
Hallajian, Tahereh .
MINING OF MINERAL DEPOSITS, 2020, 14 (02) :75-84
[5]   Prediction of the Penetration Rate and Number of Consumed Disc Cutters of Tunnel Boring Machines (TBMs) Using Artificial Neural Network (ANN) and Support Vector Machine (SVM)-Case Study: Beheshtabad Water Conveyance Tunnel in Iran [J].
Afradi, Alireza ;
Ebrahimabadi, Arash ;
Hallajian, Tahereh .
ASIAN JOURNAL OF WATER ENVIRONMENT AND POLLUTION, 2019, 16 (01) :49-57
[6]   Fuzzy adaptive imperialist competitive algorithm for global optimization [J].
Al Khaled, Abdullah ;
Hosseini, Seyedmohsen .
NEURAL COMPUTING & APPLICATIONS, 2015, 26 (04) :813-825
[7]  
[Anonymous], 2016, FUZZY LOGIC ENG APPL
[8]   Performance prediction of tunnel boring machine through developing a gene expression programming equation [J].
Armaghani, Danial Jahed ;
Faradonbeh, Roohollah Shirani ;
Momeni, Ehsan ;
Fahimifar, Ahmad ;
Tahir, M. M. .
ENGINEERING WITH COMPUTERS, 2018, 34 (01) :129-141
[9]  
Atashpaz-Gargari E, 2007, IEEE C EVOL COMPUTAT, P4661, DOI 10.1109/cec.2007.4425083
[10]   Modelling TBM performance with artificial neural networks [J].
Benardos, AG ;
Kaliampakos, DC .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2004, 19 (06) :597-605