共 50 条
- [32] Simulated annealing heuristic for scheduling to minimize mean weighted tardiness in a flowshop with sequence-dependent setup times of jobs - a case study Production Planning and Control, 1997, 8 (05): : 475 - 483
- [34] Column Generation for Sequence Dependent Flowshop Scheduling to Minimize the Total Weighted Tardiness 2011 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2011, : 1187 - 1192
- [35] Scheduling jobs with general linear deterioration to minimize total weighted number of late jobs Optimization Letters, 2024, 18 : 1217 - 1235
- [38] A Genetic Algorithm for Permutation Flowshop Scheduling With Total Flowtime Criterion 2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 1514 - +
- [39] A Novel Constructive Heuristic for Flowshop Group Scheduling Problems to Minimize Total Flow Time 2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 1639 - 1644