共 50 条
- [21] A flowshop scheduling algorithm to minimize total weighted completion time PROCEEDINGS OF THE 4TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-4, 2002, : 1485 - 1488
- [25] Branch-and-bound algorithms for scheduling in permutation flowshops to minimize the sum of weighted flowtime/sum of weighted tardiness/sum of weighted flowtime and weighted tardiness/sum of weighted flowtime, weighted tardiness and weighted earliness of jobs JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2009, 60 (07) : 991 - 1004
- [26] Genetic Algorithm to minimize flowtime in a no-wait flowshop scheduling problem 27TH INTERNATIONAL CONFERENCE ON CADCAM, ROBOTICS AND FACTORIES OF THE FUTURE 2014, 2014, 65
- [27] An iterated greedy algorithm for the distributed permutation flowshop scheduling problem with preventive maintenance to minimize total flowtime PROCEEDINGS OF THE 39TH CHINESE CONTROL CONFERENCE, 2020, : CP1 - CP1
- [30] Heuristics for scheduling in flowshops and flowline-based manufacturing cells to minimize the sum of weighted flowtime and weighted tardiness of jobs Computers and Industrial Engineering, 1999, 37 (04): : 671 - 690