Shift scheduling for steppers in the semiconductor wafer fabrication process

被引:49
作者
Kim, S
Yea, SH
Kim, B
机构
[1] Pohang Univ Sci & Technol, Dept Ind Engn, Pohang, South Korea
[2] Samsung Elect Co, Dept SCM, Yongin, South Korea
关键词
D O I
10.1080/07408170208928859
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, an approach is proposed for scheduling stepper machines that are acting as bottleneck machines in the semiconductor wafer fabrication process. We consider the problem of scheduling the steppers for an 8 hour shift, determining which types of wafer lots to work on each machine. The scheduling objective is to find the optimal stepper allocations such that the schedule meets target production quantities that have been derived from the given target Work-In-Process (WIP) levels. A Mixed Integer Programming (MIP) model is formulated, and three heuristic approaches are proposed and tested to approximately solve the MIP model. Numerical tests show that one of the proposed heuristics using linear programming relaxation of MIP generates, on average, schedules within 5% of the optimum values.
引用
收藏
页码:167 / 177
页数:11
相关论文
共 12 条
[1]   PLANNING AND SCHEDULING IN JAPANESE SEMICONDUCTOR MANUFACTURING [J].
DUENYAS, I ;
FOWLER, JW ;
SCHRUBEN, LW .
JOURNAL OF MANUFACTURING SYSTEMS, 1994, 13 (05) :323-332
[2]   CLOSED-LOOP JOB RELEASE CONTROL FOR VLSI CIRCUIT MANUFACTURING [J].
GLASSEY, CR ;
RESENDE, MGC .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1988, 1 (01) :36-46
[3]   Linear control rules for production control of semiconductor fabs [J].
Glassey, CR ;
Shanthikumar, JG ;
Seshadri, S .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1996, 9 (04) :536-549
[4]  
GOLOVIN JJ, 1994, SOLID STATE TECHNOL, V37, P322
[5]   Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility [J].
Kim, YD ;
Kim, JU ;
Lim, SK ;
Jun, HB .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1998, 11 (01) :155-164
[6]   Dynamic control of a cellular-line production system under variations in the product mix [J].
Kuroda, M ;
Tomita, T ;
Maeda, K .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 60-1 :439-445
[7]  
LEACHMAN RC, 1994, 9429 ESRC U CAL ENG
[8]  
LEACHMAN RC, 1996, J OPERATIONAL RES SO, V47, P1516
[9]   EFFICIENT SCHEDULING POLICIES TO REDUCE MEAN AND VARIANCE OF CYCLE-TIME IN SEMICONDUCTOR MANUFACTURING PLANTS [J].
LU, SCH ;
RAMASWAMY, D ;
KUMAR, PR .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1994, 7 (03) :374-388
[10]   A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY .2. SHOP-FLOOR CONTROL [J].
UZSOY, R ;
LEE, CY ;
MARTINVEGA, LA .
IIE TRANSACTIONS, 1994, 26 (05) :44-55