Reactive power procurement: A review of current trends

被引:39
作者
Anaya, Karim L. [1 ]
Pollitt, Michael G. [1 ]
机构
[1] Univ Cambridge, Judge Business Sch, Energy Policy Res Grp, Trumpington St, Cambridge CB2 1AG, England
基金
英国工程与自然科学研究理事会;
关键词
Reactive power; System operators; Distributed energy resources; Procurement methods; Auction market design; DISTRIBUTION NETWORKS; WIND; PROVISION; SERVICES; VOLTAGE; SYSTEM;
D O I
10.1016/j.apenergy.2020.114939
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper reviews the international experience in the competitive procurement of reactive power and other electricity ancillary services. It involves system operators from different jurisdictions including Australia, the United States and Great Britain. The paper evaluates the different procurement mechanisms, related compensation schemes and looks at more competitive ways for procuring reactive power. It appraises a novel approach (from the Power Potential initiative in the UK) for contracting reactive power services from distributed energy resources using a market-based mechanism. A conceptual auction design applicable to the procurement of reactive power is also discussed. Our findings suggest that competition in reactive power is very limited in comparison with other ancillary services (such as frequency regulation and capacity reserves) and the energy market. The introduction of more market-oriented mechanisms and resources (such as distributed energy resources) for acquiring reactive and active power services by the system operator gives rise to new opportunities and new ways to deal with voltage stability issues. Power Potential brings the opportunity to trial the technical and commercial solution, new roles and new interactions required in the introduction of a competitive reactive power market.
引用
收藏
页数:16
相关论文
共 91 条
[1]  
AEMO, 2017, Network Support and Control Ancillary Services Agreement. Generic Proforma
[2]   Improvement of the simultaneous active and reactive power markets pricing and structure [J].
Ahmadi, Hamed ;
Foroud, Asghar Akbari .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2016, 10 (01) :81-92
[3]   Modification of the mandatory generation region of producers in the reactive power market by considering reactive power losses [J].
Ahmadimanesh, A. ;
Kalantar, M. .
ENERGY & ENVIRONMENT, 2017, 28 (07) :744-762
[4]  
[Anonymous], REP MARK ANC SERV PR
[5]  
[Anonymous], REQ EXPR INT NETW SU
[6]  
[Anonymous], STAG 06 FIN COD MOD
[7]  
[Anonymous], EN ANN REP 2016
[8]  
[Anonymous], ANLESD161 EN SYST DI
[9]  
[Anonymous], SECT 1 OP ACC TRANSM
[10]  
[Anonymous], MYISO TAR MARK ADM C