Scheduling inbound and outbound trucks at cross docking terminals

被引:122
作者
Boysen, Nils [1 ]
Fliedner, Malte [2 ]
Scholl, Armin [3 ]
机构
[1] Univ Jena, Lehrstuhl Operat Management, D-07743 Jena, Germany
[2] Univ Hamburg, Inst Ind Management, D-20146 Hamburg, Germany
[3] Univ Jena, Lehrstuhl Betriebswirtschaftliche Entscheidungana, D-07743 Jena, Germany
关键词
Logistics; Cross docking; Truck scheduling; (Bounded) Dynamic programming; CROSSDOCKING;
D O I
10.1007/s00291-008-0139-2
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
At cross docking terminals, shipments from inbound trucks are unloaded, sorted and moved to dispatch points where they are directly loaded onto outbound trucks for an immediate delivery elsewhere in the distribution system. This warehouse management concept aims at realizing economies in transportation cost by consolidating divergent shipments to full truckloads without requiring excessive inventory at the cross dock. The efficient operation of such a system requires an appropriate coordination of inbound and outbound trucks, e.g. by computerized scheduling procedures.This work introduces a base model for scheduling trucks at cross docking terminals, which relies on a set of simplifying assumptions in order to derive fundamental insights into the underlying problem's structure, i.e. its complexity, and to develop a building block solution procedure, which might be employed to solve more complex real-world truck scheduling problems.
引用
收藏
页码:135 / 161
页数:27
相关论文
共 23 条
[1]  
Apte U.M., 2000, International Journal of Logistics Research and Applications, V3, P291, DOI [10.1080/713682769, DOI 10.1080/713682769]
[2]   The best shape for a crossdock [J].
Bartholdi, JJ ;
Gue, KR .
TRANSPORTATION SCIENCE, 2004, 38 (02) :235-244
[3]   Reducing labor costs in an LTL crossdocking terminal [J].
Bartholdi, JJ ;
Gue, KR .
OPERATIONS RESEARCH, 2000, 48 (06) :823-832
[4]   Heuristics and exact algorithms for solving the Monden problem [J].
Bautista, J ;
Companys, R ;
Corominas, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (01) :101-113
[5]  
Bermudez R, 2001, MBTC1102 U ARK
[6]   Sequencing mixed-model assembly lines to minimize part inventory cost [J].
Boysen, Nils ;
Fliedner, Malte ;
Scholl, Armin .
OR SPECTRUM, 2008, 30 (03) :611-633
[7]  
Campbell JF, 1994, Studies in Locational Analysis, V6, P31
[8]   AN IMPROVED DISCRETE DYNAMIC-PROGRAMMING ALGORITHM FOR ALLOCATING RESOURCES AMONG INTERDEPENDENT PROJECTS [J].
CARRAWAY, RL ;
SCHMIDT, RL .
MANAGEMENT SCIENCE, 1991, 37 (09) :1195-1200
[9]  
Forger G., 1995, Modern material handling, V36, P36
[10]  
Garey M., 1979, GUIDE THEORY NP COMP