Long-term assessment of power capacity incentives by modeling generation investment dynamics under irreversibility and uncertainty

被引:9
作者
Rios-Festner, Daniel [1 ]
Blanco, Gerardo [1 ]
Olsina, Fernando [2 ]
机构
[1] Natl Univ Asuncion, Polytech Fac, San Lorenzo, Paraguay
[2] Natl Univ San Juan, CONICET, Inst Elect Energy, San Juan, Argentina
关键词
Capacity markets; Capacity payments; Generation investments; Real options; Supply reliability; System dynamics; ELECTRICITY MARKET; SYSTEM DYNAMICS; SIMULATION; OPTIONS; IMPACT; RELIABILITY; MECHANISM; ADEQUACY;
D O I
10.1016/j.enpol.2019.111185
中图分类号
F [经济];
学科分类号
02 ;
摘要
In actual energy-only markets, the high volatility of power prices affects the expected returns of generators. When dealing with irreversibility under uncertainty, deferring decisions to commit in new power plants, waiting for better information, is therefore a rational approach. Theoretical and empirical evidence suggests that such investment pattern determines the occurrence of construction cycles, which strongly compromise supply security. In order to supplement generators' revenues, several remuneration mechanisms have been devised over past years. Along this line, this work addresses the long-run dynamics of capacity adequacy and market efficiency with both a price-based and a quantity-based capacity remuneration policy. For that purpose, a recently-developed, stochastic simulation model is used as a benchmark. Hence, the optimal postponement of generation investment decisions is integrated into a long-run power market model by formulating the decision-making problem in the framework of Real Options Analysis. Results suggest that policymakers may exchange supply security (effectiveness) for energy prices to be paid by consumers (efficiency) when designing and implementing capacity remuneration mechanisms. By doing so, this article contributes to the ongoing debate regarding the design of incentive policies and efficient power markets by considering the microeconomics of investors' decision-making under irreversibility and uncertainty.
引用
收藏
页数:15
相关论文
共 55 条
  • [1] The impact of investors' risk aversion on the performances of capacity remuneration mechanisms
    Abani, Ahmed Ousman
    Hary, Nicolas
    Rious, Vincent
    Saguan, Marcelo
    [J]. ENERGY POLICY, 2018, 112 : 84 - 97
  • [2] Application of system dynamics approach in electricity sector modelling: A review
    Ahmad, Salman
    Tahar, Razman Mat
    Muhammad-Sukki, Firdaus
    Munir, Abu Bakar
    Rahim, Ruzairi Abdul
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2016, 56 : 29 - 37
  • [3] UNCERTAINTY CONSIDERATIONS IN THE POOL PURCHASE PRICE IN THE ENGLAND AND WALES ELECTRICITY SUPPLY INDUSTRY
    ALLAN, RN
    SANCHEZ, HN
    [J]. IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1994, 141 (02) : 125 - 132
  • [4] Forward contracts in electricity markets and capacity investment: A simulation study
    Alvarez-Uribe, Karla C.
    Arango-Aramburo, Santiago
    Larsen, Erik R.
    [J]. UTILITIES POLICY, 2018, 54 : 1 - 10
  • [5] [Anonymous], 2010, 2010 IEEE POW EN SOC
  • [6] [Anonymous], 2002, Power System Economics
  • [7] [Anonymous], 2008, P IEEE POW EN SOC GE
  • [8] [Anonymous], PORTFOLIO ASPECTS RE
  • [9] [Anonymous], 2014, IMPL EL MARK REF
  • [10] [Anonymous], INT T ELECT ENERGY