Separation and recovery of iron and arsenic from acid leaching wastewater by valence state transformation

被引:5
作者
Cao, Pan [1 ]
Long, Hua [1 ]
Zhang, Mengxin [1 ]
Zheng, Yajie [1 ]
机构
[1] Cent South Univ, Sch Met & Environm, Changsha 410083, Peoples R China
来源
JOURNAL OF ENVIRONMENTAL CHEMICAL ENGINEERING | 2021年 / 9卷 / 05期
关键词
Acid leaching wastewater; Arsenic; Iron; Valence state transformation; Separation and recovery; CONTINUOUS CIRCUIT COPRECIPITATION; LIME NEUTRALIZATION; FERRIC IRON; CO-IONS; GOLD; SULFATE; CYANIDE; HYDROXIDE; DUST;
D O I
10.1016/j.jece.2021.105871
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Acid leaching wastewater, produced in the acid pre-leaching process of gold-bearing dust, contains a lot of iron (Fe) and arsenic (As). If these wastewater are discharged directly without proper treatment, massive destruction on the environment will be caused, and a large amount of arsenic and iron resources will be wasted. In this study, Fe(III) reduction by pyrite, recovery and purification of crude green-vitriol and crude As2O3, and disposal of arsenic-bearing solid waste were studied. Based on those studies, a novel process containing Fe(III) reduction with pyrite, iron recovery after Fe(III) reduction, and arsenic recovery from the solution after iron recovery was proposed to separate and recover Fe and As from an acid leaching wastewater. Results showed that reduction efficiency of Fe(III) in acid leaching wastewater achieved 96.43% under the optimal conditions (80 degrees C, L S-1 5:1, 3 h). Recovery efficiency of iron in crude green-vitriol achieved 82.37%; moreover, 73.32% As remained in the solution after iron recovery. Through purification, purified green-vitriol reached the national standard of class-I green-vitriol (GB 10531-2006), and the direct recovery efficiency of iron was 51.46%. Through neutralization, SO2 reduction, recovery and purification of crude As2O3, purified As2O3 reached the national standard of As2O3-3 (GB 26721-2011), and the direct recovery efficiency of arsenic achieved 74.89%. This process realized the efficient recovery of iron and arsenic from acid leaching wastewater, and also realized the harmless disposal of arsenic-containing solid waste.
引用
收藏
页数:12
相关论文
共 51 条
[21]   Coprecipitation of arsenate with iron(III) in aqueous sulfate media: Effect of time, lime as base and co-ions on arsenic retention [J].
Jia, Yongfeng ;
Demopoulos, George P. .
WATER RESEARCH, 2008, 42 (03) :661-668
[22]   SOLUBILITIES AND STABILITIES OF FERRIC ARSENATE COMPOUNDS [J].
KRAUSE, E ;
ETTEL, VA .
HYDROMETALLURGY, 1989, 22 (03) :311-337
[23]  
Liu L.J., 2012, J MAT METALL, V11, P75
[24]   Purification of crude As2O3 recovered from antimony smelting arsenic-alkali residue [J].
Long, Hua ;
Huang, Xing-zhong ;
Zheng, Ya-Jie ;
Peng, Ying-lin ;
He, Han-bing .
PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2020, 139 :201-209
[25]   Recovery of alkali, selenium and arsenic from antimony smelting arsenic-alkali residue [J].
Long, Hua ;
Zheng, Ya-jie ;
Peng, Ying-lin ;
He, Han-bing .
JOURNAL OF CLEANER PRODUCTION, 2020, 251
[26]  
Ma T., IODINE DEFICIENCY DI
[27]   Arsenic round the world: a review [J].
Mandal, BK ;
Suzuki, KT .
TALANTA, 2002, 58 (01) :201-235
[28]   Effects of morphological characteristics on the mechanical behavior of 3D printed ordered pore topological Fe scaffold [J].
Mishra, Dipesh Kumar ;
Pandey, Pulak Mohan .
MATERIALS SCIENCE AND ENGINEERING A-STRUCTURAL MATERIALS PROPERTIES MICROSTRUCTURE AND PROCESSING, 2021, 804
[29]   Review of arsenic metallurgy: Treatment of arsenical minerals and the immobilization of arsenic [J].
Nazari, Amir Mohammad ;
Radzinski, Rebecca ;
Ghahreman, Ahmad .
HYDROMETALLURGY, 2017, 174 :258-281
[30]  
Nishimura T., 1998, MIN PROC EXT MET REV, V18, P283, DOI DOI 10.1080/08827509808914159