Identification and ordering of safety performance indicators using fuzzy TOPSIS: a case study in Indian construction company

被引:14
作者
Singh, Arpit [1 ]
Misra, Subhas C. [1 ]
Kumar, Vinod [2 ]
Kumar, Uma [2 ]
机构
[1] Indian Inst Technol Kanpur, Ind & Management Engn, Kanpur, Uttar Pradesh, India
[2] Carleton Univ, Sprott Sch Business, Ottawa, ON, Canada
关键词
Fuzzy TOPSIS; Occupational accidents; OHS; Workplace safety; Safety compliance; LABOR PRODUCTIVITY; DECISION-MAKING; MANAGEMENT; WORKER; INDUSTRY; CLIMATE; INFORMATION; PROJECTS; SYSTEM; IMPACT;
D O I
10.1108/IJQRM-02-2020-0051
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The purpose of this paper is to propose a practical framework to measure the safety performance of workers in the Indian construction industry. The key safety performance indicators are identified and ordered on the premise that the higher order assignment of an indicator implies a strong indication of an effective safety performance. Design/methodology/approach Various indicators of safety performance in the construction industry were identified from extant literature review combined with author's personal viewpoint. The identified variables were inquired for appropriateness for the Indian construction scenario by consultation with experts. Fuzzy Technique for order preference by similarity to ideal solution (TOPSIS) technique was considered for the ranking of the indicators from most to least important. Findings The most important highlight of the study was the importance of the role of management by participating in informing workers about the safety rules and compliance toward safety measures. Proper and timely safety training to the workers and equipping them with sophisticated safety equipment for daily activities is perceived to be highly important in ensuring a safe and healthy workplace environment. Controlling the absenteeism rate reduces the burden of extra work on the employees, thereby, encouraging safe work-related behavior. Originality/value Senior management should make safety induction programs compulsory at the time of joining of the employees. The guidelines for safety practices, rules and information about the safety equipment should be properly documented and arranged in safety manuals. Periodical drills involving visual demonstration of the safety practices should be followed to ensure safety at workplace.
引用
收藏
页码:77 / 114
页数:38
相关论文
共 112 条
[51]  
Janusonyte G., 2019, INT COUNC RES INN BU
[52]   Inter-rater reliability and validity of risk of bias instrument for non-randomized studies of exposures: a study protocol [J].
Jeyaraman, Maya M. ;
Al-Yousif, Nameer ;
Robson, Reid C. ;
Copstein, Leslie ;
Balijepalli, Chakrapani ;
Hofer, Kimberly ;
Fazeli, Mir S. ;
Ansari, Mohammed T. ;
Tricco, Andrea C. ;
Rabbani, Rasheda ;
Abou-Setta, Ahmed M. .
SYSTEMATIC REVIEWS, 2020, 9 (01)
[53]  
Kamal M., 2020, EMPOWERMENT SMALL EN
[54]   Designing predictive maintenance systems using decision tree-based machine learning techniques [J].
Kaparthi, Shashidhar ;
Bumblauskas, Daniel .
INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2020, 37 (04) :659-686
[55]  
Karakhan A., 2019, Advances in Informatics and Computing in Civil and Construction Engineering, P823, DOI [10.1007/978-3-030-00220-6_99, DOI 10.1007/978-3-030-00220-6_99]
[56]   The Analysis of Essential Factors Responsible for Loss of Labour Productivity in Building Construction Projects in India [J].
Karthik, Dasari ;
Rao, C. B. K. .
ENGINEERING JOURNAL-THAILAND, 2019, 23 (02) :55-70
[57]  
Kim G.-H., 2018, J. Build. Construct. Plann. Res., V6, DOI [10.4236/jbcpr.2018.64018, DOI 10.4236/JBCPR.2018.64018]
[58]   The role of the safety climate in the successful implementation of safety management systems [J].
Kim, Ng Khean ;
Rahim, Noor Fareen Abdul ;
Iranmanesh, Mohammad ;
Foroughi, Behzad .
SAFETY SCIENCE, 2019, 118 :48-56
[59]   An interactive risk visualisation tool for large-scale and complex engineering and construction projects under uncertainty and interdependence [J].
Kimiagari, Salman ;
Keivanpour, Samira .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (21) :6827-6855
[60]   Impact of quality management systems on firm performance [J].
Kumar, Pankaj ;
Maiti, J. ;
Gunasekaran, Angappa .
INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2018, 35 (05) :1034-1059