Optimizing a High-Speed Railway Operation Plan Based on Train Capacity and Service Frequency

被引:4
作者
Wang, Qing [1 ]
Deng, Lianbo [1 ]
Chen, Yuxin [1 ]
Zhou, Wenliang [1 ]
Niu, Feng [2 ]
机构
[1] Cent South Univ, Sch Traff & Transportat Engn, Rail Data Res & Applicat Key Lab Hunan Provt, Changsha 410075, Peoples R China
[2] China State Railway Grp Co Ltd China Railway, 10 Fuxing Rd, Beijing 100844, Peoples R China
关键词
High-speed railway; Service frequency; Train route plan; Train stop schedule plan; Two-stage method;
D O I
10.1061/JTEPBS.0000414
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper, a model to optimize a high-speed railway operation plan by dividing it into a train route plan and train stop schedule plan was developed based on the train capacity and service frequency. To capture the intersection between the operator and the passenger, a multiobjective model was established for a high-speed railway corridor. This multiobjective model can be divided into two submodels. For the operator, the train empty seat minimization model seeks to improve the effective utilization of the seats, whereas for passengers, the goal is to minimize total travel time costs. The train and station service capacities and constraints were considered to better model the operation of trains on a high-speed railway line. Furthermore, to obtain a feasible solution to railway operation planning, a greedy heuristics algorithm is proposed, which included two stages. Based on the real data of the Beijing-Shanghai high-speed railway corridor in China, the effectiveness of the proposed model and method were verified.
引用
收藏
页数:13
相关论文
共 24 条
[1]   High-Speed Rail: Lessons for Policy Makers from Experiences Abroad [J].
Albalate, Daniel ;
Bel, Germa .
PUBLIC ADMINISTRATION REVIEW, 2012, 72 (03) :336-349
[2]  
Arenas D., 2015, P 6 INT C RAILW OP M
[3]   Optimal lines for railway systems [J].
Bussieck, MR ;
Kreuzer, P ;
Zimmermann, UT .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 96 (01) :54-63
[4]   An Alternate Double-Single Track Proposal for High-Speed Peripheral Railway Lines [J].
Castillo, Enrique ;
Gallego, Inmaculada ;
Sanchez-Cambronero, Santos ;
Maria Menendez, Jose ;
Rivas, Ana ;
Nogal, Maria ;
Grande, Zacarias .
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2015, 30 (03) :181-201
[5]   Timetabling optimization of a mixed double- and single-tracked railway network [J].
Castillo, Enrique ;
Gallego, Inmaculada ;
Maria Urena, Jose ;
Maria Coronado, Jose .
APPLIED MATHEMATICAL MODELLING, 2011, 35 (02) :859-878
[6]   A multiobjective model for passenger train services planning: application to Taiwan's high-speed rail line [J].
Chang, YH ;
Yeh, CH ;
Shen, CC .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2000, 34 (02) :91-106
[7]   High-Speed Train Stop-Schedule Optimization Based on Passenger Travel Convenience [J].
Chen, Dingjun ;
Ni, Shaoquan ;
Xu, Chang'an ;
Lv, Hongxia ;
Wang, Simin .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2016, 2016
[8]   Cost optimal allocation of rail passenger lines [J].
Claessens, MT ;
van Dijk, NM ;
Zwaneveld, PJ .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 110 (03) :474-489
[9]  
DeUrena JM, 2012, TRANS MOBIL SER, P1
[10]  
Douglas N., 2011, AUSTRALASIAN TRANSPO, P28