A Markovian production-inventory system with consideration of random quality disruption

被引:2
作者
Karim, Rubayet [1 ]
Nakade, Koichi [1 ]
机构
[1] Nagoya Inst Technol, Dept Architecture Civil Engn & Ind Management Eng, Showa Ku, Gokiso Cho, Nagoya, Aichi 4668555, Japan
基金
日本学术振兴会;
关键词
Quality disruption; Imperfect production-inventory system; Safety stock; Rework; Production time constraint; Optimization; IMPERFECT PRODUCTION; EPQ MODEL; DEMAND; REWORK; TIME;
D O I
10.1299/jamdsm.2020jamdsm0071
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we develop a stochastic model for an imperfect production-inventory system that faces random quality disruption and has limited time for production. In each time planning horizon, the inventory level is affected by product quality disruption. When the production system switches to the `out-of-control' state from the `in-control' state, it starts producing some defective products along with defect-free products, and this switching time is stochastic. The process of the inventory levels at the start of the time horizon is expressed by using a finite and continuous state continuous-time Markov process. We construct mathematical expressions of the transition probability, the steady-state probability, and the long-run average cost. Through a numerical experiment, the near-optimal solution is achieved. The outcome shows that under the situation of production time constraint, the integration of safety stock in an interruption prone production-inventory system, assists in improving the average cost function. The results also show that the optimal safety stock is large when the defect percentage, or the production switching rate, or the shortage cost is very high. Conversely, the small safety stock is desirable when the inventory holding cost or the rework cost is high.
引用
收藏
页数:18
相关论文
共 26 条
[21]  
Sarkar Biswajit, 2010, International Journal of Mathematics in Operational Research, V2, P467, DOI 10.1504/IJMOR.2010.033441
[22]   Optimal batch sizing in a multi-stage production system with rework consideration [J].
Sarker, Bhaba R. ;
Jamal, A. M. M. ;
Mondal, Sanjay .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 184 (03) :915-929
[23]   Imperfect production inventory model for time and effort dependent demand under inflation and maximum reliability [J].
Shah, Nita H. ;
Vaghela, Chetansinh R. .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2018, 5 (01) :60-68
[24]   An imperfect multi-product production system with rework [J].
Taleizadeh, A. A. ;
Jalali-Naini, S. Gh ;
Wee, H. -M. ;
Kuo, T. -C. .
SCIENTIA IRANICA, 2013, 20 (03) :811-823
[25]   A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process [J].
Taleizadeh, Ata Allah ;
Eduardo Cardenas-Barron, Leopoldo ;
Mohammadi, Babak .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 150 :9-27
[26]   A Two Stage Solution Procedure for Production Planning System with Advance Demand Information [J].
Ueno, Nobuyuki ;
Kadomoto, Kiyotaka ;
Hasuike, Takashi ;
Okuhara, Koji .
JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2012, 6 (05) :633-646