Sustainable management of end-of-life systems

被引:20
作者
Godichaud, Matthieu [2 ]
Tchangani, Ayeley [1 ]
Peres, Francois [1 ]
Iung, Benoit [3 ]
机构
[1] Ecole Natl Ingn Tarbes, Lab Genie Prod, Tarbes, France
[2] LAAS CNRS, F-31077 Toulouse 4, France
[3] Ctr Rech Automat Nancy, Vandoeuvre Les Nancy, France
关键词
disassembly; reverse logistic; modelling; Bayesian networks; optimisation; uncertainties; PRODUCT STRUCTURES; HEURISTICS; RECOVERY; NETWORKS; POLICIES; MODEL;
D O I
10.1080/09537287.2011.591656
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In a sustainable development context, the stakes of the last stage of system life cycle, the end-of-life stage, have increased over recent years. End-of-life systems have to be de-manufactured in order to be valued so as to respond to environmental concerns. The aim of a disassembly strategy consists in issuing a solution to the whole decision problem raised during the end-of-life stage of systems. Indeed, decision makers have to select valuable components according to technical, economical and environmental criteria and then design and optimise a disassembly support system that will generate these products. The solution obtained is what we refer to in this article as a disassembly trajectory. The work presented in this article is about planning these trajectories on different horizons integrating several arrivals of end-of-life systems. The proposed approach, with Bayesian networks and influence diagrams as the underlying mathematical tools, enables dynamically defined uncertainties to be taken into account.
引用
收藏
页码:216 / 236
页数:21
相关论文
共 30 条
[1]  
[Anonymous], 2007, Bayesian networks and decision graphs, DOI DOI 10.1007/978-0-387-68282-2
[2]   Lot sizing in reverse MRP for scheduling disassembly [J].
Barba-Gutierrez, Y. ;
Adenso-Diaz, B. ;
Gupta, S. M. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) :741-751
[3]  
Barba-Gutierrez Y., 2008, INT J ADV MANUF TECH, V4, P413
[4]   Controlling inventories with stochastic item returns: A basic model [J].
Fleischmann, M ;
Kuik, R ;
Dekker, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 138 (01) :63-75
[5]   SCHEDULING DISASSEMBLY [J].
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) :1857-1866
[6]   Inference in belief networks: A procedural guide [J].
Huang, C ;
Darwiche, A .
INTERNATIONAL JOURNAL OF APPROXIMATE REASONING, 1996, 15 (03) :225-263
[7]   Heuristics for solving disassemble-to-order problems with stochastic yields [J].
Inderfurth, K ;
Langella, IM .
OR SPECTRUM, 2006, 28 (01) :73-99
[8]   Leadtime effects and policy improvement for stochastic inventory control with remanufacturing [J].
Inderfurth, K ;
van der Laan, E .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 71 (1-3) :381-390
[9]   Product recovery in stochastic remanufacturing systems with multiple reuse options [J].
Inderfurth, K ;
de Kok, AG ;
Flapper, SDP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 133 (01) :130-152
[10]   Simple optimal replenishment and disposal policies for a product recovery system with leadtimes [J].
Inderfurth K. .
Operations-Research-Spektrum, 1997, 19 (2) :111-122