Day-Ahead Operational Scheduling With Enhanced Flexible Ramping Product: Design and Analysis

被引:19
作者
Ghaljehei, Mohammad [1 ]
Khorsand, Mojdeh [1 ]
机构
[1] Arizona State Univ, Dept Elect Comp & Energy Engn, Tempe, AZ 85281 USA
关键词
Load modeling; Uncertainty; Costs; Regulation; Indexes; Renewable energy sources; Schedules; Flexible ramping product; renewable energy sources; ramping requirement; day-ahead market; DISPATCH; MARKETS; ENERGY;
D O I
10.1109/TPWRS.2021.3110712
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
New resource mix, e.g., renewable resources, are imposing operational complexities to modern power systems by intensifying uncertainty and variability in the system net load. This issue has motivated independent system operators (ISOs), e.g., California ISO (CAISO), to add flexible ramping products (FRPs) to their day-ahead (DA) market models. Such structural changes in the DA market formulation require further analyses and detailed design to ensure adequate operational flexibility, market efficiency, and reliability. This paper conducts a comprehensive study to: (a) augment existing DA market models with enhanced FRP design to schedule ramp capabilities that are more adaptive with respect to the real-time (RT) 15-min net load variability and uncertainty, and (b) design corresponding market payment policies that accurately reflect the value of the added flexibility through enhanced FRP design. The proposed FRP design can be implemented in present-day system operations with minimal disruption to existing DA market models. Performance of the proposed DA market model, which includes the enhanced FRP design, is compared against the DA market model with existing FRP design through a validation methodology based on RT unit commitment model. This validation methodology mimics fifteen-minute markets of CAISO. The proposed method is tested on an IEEE 118-bus test system.
引用
收藏
页码:1842 / 1856
页数:15
相关论文
共 32 条
[1]   Strategic Bidding in Secondary Reserve Markets [J].
Alberto Campos, Fco. ;
Munoz San Roque, Antonio ;
Sanchez-Ubeda, Eugenio F. ;
Portela Gonzalez, Jose .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (04) :2847-2856
[2]   Multistage Multiresolution Robust Unit Commitment With Nondeterministic Flexible Ramp Considering Load and Wind Variabilities [J].
Alizadeh, Mohammad Iman ;
Moghaddam, Mohsen Parsa ;
Amjady, Nima .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2018, 9 (02) :872-883
[3]  
[Anonymous], 2015, Urban Institute Revised Proposal
[4]  
[Anonymous], 2017, IEEE T SUSTAIN ENERG, DOI DOI 10.1109/TSTE.2017.2647781
[5]  
[Anonymous], 2018, California ISO
[6]  
[Anonymous], 2015, Ieee 118 bus test system
[7]  
CAISO, 1998, ANC SERV
[8]  
CAISO, 2019, California independent system operator corporation fifth replacement electronic tariff
[9]  
CAISO, 1998, ANC SERV REQ PROT
[10]  
CAISO, 2019, DAY AH MARK ENH