Reduce plant startup problems

被引:0
作者
Bowdoin, KA [1 ]
机构
[1] ST2EP LLC, Houston, TX USA
关键词
Accident prevention - Environmental impact - Handbooks - Inspection - Planning - Plant startup - Preventive maintenance - Regulatory compliance - Service life - Supervisory personnel - Water cooling systems;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Operation engineers and supervisors are required to take every precaution to follow all the necessary guidelines to efficiently start up a plant in a timely, safety and cost-effective fashion. Startup guidelines are presented which assume that the contractor has not only constructed the plant by the P&IDs but also has the responsibility for the startup.
引用
收藏
页码:59 / 59
页数:1
相关论文
empty
未找到相关数据