Speeding up Based on the Process Optimization of High Voltage Business Expanding

被引:0
作者
Li Juan [1 ]
Jiang Haiying [2 ]
机构
[1] State Grid Corp China, Co Licheng Dist Jinan, Jinan, Peoples R China
[2] Univ Jinan, Sch Informat Sci & Engn, Jinan, Peoples R China
来源
MECHATRONICS ENGINEERING, COMPUTING AND INFORMATION TECHNOLOGY | 2014年 / 556-562卷
关键词
power supply company; business expanding; process optimization; average power access time;
D O I
10.4028/www.scientific.net/AMM.556-562.1950
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
As the primary link and the accepting link of power supply and sale, the quality of business expansion is directly related to the economic benefits and social profile of the power company. By many measures, such as reducing the link of process and delayering business expansion process, realizing multi link synchronous operation and integrally operating all qualified links, the process of high voltage business expansion project is optimized. The practice proves that these measures effectively reduce the average time of power access, and improve the level of power supply service.
引用
收藏
页码:1950 / +
页数:2
相关论文
共 5 条
[1]  
CAI Xiao-juan, 2012, POWER DEMAND SIDE MA, V14, P56
[2]  
Chen Zhongxiu, 2012, CHEM THERMODYN, P71
[3]  
LI Li, 2007, SCI TECH INFORM DEV, V17, P238
[4]  
Li S. F, 2006, THESIS
[5]  
Liao Yunjiang, 2010, GUIZHOU ELECT POWER, V13, P35