An uncertain multi-objective programming model for machine scheduling problem

被引:18
作者
Ning, Yufu [1 ,2 ]
Chen, Xiumei [1 ,2 ]
Wang, Zhiyong [1 ,2 ]
Li, Xiangying [1 ,2 ]
机构
[1] Shandong Youth Univ Polit Sci, Sch Informat Engn, Jinan 250103, Shandong, Peoples R China
[2] Univ Shandong, Key Lab Informat Secur & Intelligent Control, Jinan 250103, Shandong, Peoples R China
关键词
Machine scheduling problem; Uncertain variable; Uncertain programming; Genetic algorithm;
D O I
10.1007/s13042-016-0522-2
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper discusses a parallel machine scheduling problem in which the processing times of jobs and the release dates are independent uncertain variables with known uncertainty distributions. An uncertain programming model with multiple objectives is obtained, whose first objective is to minimize the maximum completion time or makespan, and second objective is to minimize the maximum tardiness time. A genetic algorithm is employed to solve the proposed uncertain machine scheduling model, and its efficiency is illustrated by some numerical experiments.
引用
收藏
页码:1493 / 1500
页数:8
相关论文
共 35 条
[1]   Group shops scheduling with makespan criterion subject to random release dates and processing times [J].
Ahmadizar, Fardin ;
Ghazanfari, Mehdi ;
Ghomi, Seyyed Mohammad Taghi Fatemi .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (01) :152-162
[2]  
[Anonymous], 2002, Uncertainty Theory
[3]  
[Anonymous], P MIN C MAN UNC DEC
[4]  
[Anonymous], INF INT INTERDISCIP
[5]  
[Anonymous], 2009, THEORY PRACTICE UNCE
[6]  
[Anonymous], MANAG SCI
[7]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[8]   SINGLE FACILITY SEQUENCING WITH RANDOM EXECUTION TIMES [J].
BANERJEE, BP .
OPERATIONS RESEARCH, 1965, 13 (03) :358-&
[9]  
Brucker P., 1977, Ann. Discrete Math., V1, P343, DOI [DOI 10.1016/S0167-5060(08)70743-X, 10.1016/S0167-5060(08)70743-X]
[10]  
Chen X., 2011, Int. J. Oper. Res., V8, P32