Task allocation optimization in collaborative customized product development based on double-population adaptive genetic algorithm

被引:12
作者
Bao, Beifang [1 ,3 ]
Yang, Yu [1 ,3 ]
Chen, Qian [1 ,3 ]
Liu, Aijun [2 ,3 ]
Zhao, Jiali [1 ,3 ]
机构
[1] Chongqing Univ, State Key Lab Mech Transmiss, Chongqing 400030, Peoples R China
[2] Xidian Univ, Econ & Management Sch, Xian 710071, Peoples R China
[3] Chongqing Univ, Dept Ind Engn, Coll Mech Engn, 174 Shazheng, Chongqing 400030, Peoples R China
基金
高等学校博士学科点专项科研基金;
关键词
Collaborative customized product development; Task allocation; Task fitness; Task coordination efficiency; Double-population adaptive genetic algorithm; SYSTEMS; ASSIGNMENT; MODEL;
D O I
10.1007/s10845-014-0937-0
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Task allocation is one of the most important activities in the process of collaborative customized product development. At present, how to allocate the collaborative development tasks scientifically and rationally becomes one of the hot research issues in the field of product development. Although many scholars in academia has made a significant contribution to the problem of task allocation and achieved many useful results, the research work of collaborative development task allocation for product customization is still lacking. Therefore, in view of the insufficient consideration on task fitness and task coordination for task allocation in collaborative customized product development at present, research work in this paper is conducted based on the analysis of collaborative customized product development process and task allocation strategy. The definition and calculation formula of task fitness and task coordination efficiency are given firstly, then the multi-objective optimization model of product customization task allocation is constructed and the solving method based on the model of double-population adaptive genetic algorithm is proposed. Finally, the feasibility and the effectiveness of task allocation algorithm are tested and verified by the example of a 5MW wind turbine product development project.
引用
收藏
页码:1097 / 1110
页数:14
相关论文
共 19 条
  • [1] On-line maintenance job scheduling and assignment to resources in distributed systems by heuristic-based optimization
    Adzakpa, KP
    Adjallah, KH
    Yalaoui, F
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2004, 15 (02) : 131 - 140
  • [2] [Anonymous], 2003, THESIS
  • [3] [Anonymous], 2010, THESIS
  • [4] [Anonymous], 2005, MATLAB GENETIC ALGOR
  • [5] Time-out protocol for task allocation in multi-agent systems
    Anussornnitisarn, P
    Peralta, J
    Nof, SY
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2002, 13 (06) : 511 - 522
  • [6] A hybrid heuristic to solve a task allocation problem
    Chen, WH
    Lin, CS
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2000, 27 (03) : 287 - 303
  • [7] A generic supplier management tool for outsourcing manufacturing
    Choy, KL
    Lee, WB
    [J]. SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2003, 8 (02) : 140 - 154
  • [8] Market-based task allocation mechanisms for limited-capacity suppliers
    Dash, Rajdeep K.
    Vytelingum, Perukrishnen
    Rogers, Alex
    David, Esther
    Jennings, Nicholas R.
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 2007, 37 (03): : 391 - 405
  • [9] Fernandez W., 2003, DISCRETE APPL MATH, V131, P169
  • [10] Project-oriented task scheduling for mobile robot team
    Hasgul, Servet
    Saricicek, Inci
    Ozkan, Metin
    Parlaktuna, Osman
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2009, 20 (02) : 151 - 158