Coordinating a two-level supply chain with production interruptions to restore process quality

被引:16
|
作者
El Saadany, Ahmed M. A. [1 ]
Jaber, Mohamad Y. [1 ]
机构
[1] Ryerson Univ, Dept Mech & Ind Engn, Toronto, ON M5B 2K3, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
quality and inventory; process improvement; supply chain coordination;
D O I
10.1016/j.cie.2007.06.037
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The classical inventory model, known as the lot size problem (LSP), assumes items produced and stocked to be of perfect quality. In reality, production processes are not defect free. Such imperfect processes generate defects that are reworked, and in some cases scrapped. The move by practitioners towards smaller lot sizes; e.g., just-in-time (JIT), as a mean of improving process and product quality prompted researchers to modify the LSP to represent reality more faithfully. The studies conducted by these researchers confirmed the observed benefits of smaller lot sizes. The inventory models developed in these studies assume that defects increase as the lot size increases, and that adjusting the process within a production cycle is not possible. Contrary to this assumption, in a JIT environment workers are authorized to stop production if a quality or production problem arises. This practice encouraged Khouja [Khouja, M. (2005). The use of minor setups within production cycles to improve product quality and yield. International Transactions in Operations Research, 12(4), 403-416] to reformulate some inventory models which take into account the negative relationship between lot size and quality and the possibility of performing minor setups. This requires stopping the process during a production cycle. This paper investigates the work of Khouja in a centralized decision model where players in a two-level (manufacturer-retailer) supply chain coordinate their orders to minimize their local costs and that of the chain. Mathematical models are developed with numerical results discussed. (c) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:95 / 109
页数:15
相关论文
共 45 条
  • [1] Coordinating a two-level supply chain with delay in payments and profit sharing
    Jaber, M. Y.
    Osman, I. H.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2006, 50 (04) : 385 - 400
  • [2] Vendor Managed Inventory (VMI) with Consignment Stock (CS) agreement for a two-level supply chain with an imperfect production process with/without restoration interruptions
    Bazan, Ehab
    Jaber, Mohamad Y.
    Zanoni, Simone
    Zavanella, Lucio E.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 157 : 289 - 301
  • [3] Coordinating corporate social responsibility in a two-level supply chain under bilateral information asymmetry
    Vosooghidizaji, Mohammadali
    Taghipour, Atour
    Canel-Depitre, Beatrice
    JOURNAL OF CLEANER PRODUCTION, 2022, 364
  • [4] Coordination in a two-level supply chain with option
    Rajapov, Azamat
    Ming, Jian
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON CIVIL, TRANSPORTATION AND ENVIRONMENT, 2016, 78 : 291 - 295
  • [5] Coordinating Two-Level Supply Chain with Risk-averse Preferences Based on Revenue-sharing Contract
    Pang Qinghua
    PROCEEDINGS OF THE 27TH CHINESE CONTROL CONFERENCE, VOL 6, 2008, : 774 - 779
  • [6] Existence of equilibria in a decentralized two-level supply chain
    Morales, Dolores Romero
    Vermeulen, Dries
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 197 (02) : 642 - 658
  • [7] Risk Analysis of a Two-Level Supply Chain Subject to Misplaced Inventory
    Zhu, Lijing
    Lee, Chulung
    APPLIED SCIENCES-BASEL, 2017, 7 (07):
  • [8] Coordination mechanism for a deteriorating item in a two-level supply chain system
    Rahdar, Mohammad
    Nookabadi, Ali S.
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (11-12) : 2884 - 2900
  • [9] Study on Joint Contract of Return Policy and Sales Rebate Based on Two-Level Supply Chain
    Li, Ying
    Wang, Xianwei
    Lin, Feng
    IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 2024 - 2030
  • [10] Coordinating a Two Level Supply Chain with Waste-Averse Preferences Based on Revenue-Sharing Contract
    Pang, Qinghua
    Cheng, Chao
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1094 - +