Stochastic cell loading to minimize nT subject to maximum acceptable probability of tardiness

被引:8
作者
Egilmez, Goekhan [1 ]
Sueer, Guersel A. [2 ]
机构
[1] N Dakota State Univ, Dept Ind & Mfg Engn, Fargo, ND 58104 USA
[2] Ohio Univ, Dept Ind & Syst Engn, Athens, OH 45701 USA
关键词
Cell loading; Non-linear modeling; Stochastic scheduling; Number of tardy jobs; MANUFACTURING SYSTEM; PROCESSING TIMES; TARDY JOBS; PARALLEL MACHINES; SCHEDULING JOBS; WEIGHTED NUMBER; EXPECTED NUMBER; DESIGN; ALGORITHM; ASSIGNMENT;
D O I
10.1016/j.jmsy.2014.11.018
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, stochastic cell loading problem is addressed. The problem is observed in labor-intensive manufacturing cells where operation times and hence in-cell times are probabilistic due to continuous operator involvement throughout the manufacturing processes. The objective is to minimize the number of tardy jobs subject to maximum acceptable probability of tardiness (risk level). A job is called "tardy" if the probability of tardiness is greater than the risk level otherwise it is called early. The risk level is used as a preferred scheduling risk that will be taken by operations planner. A stochastic non-linear mathematical model is developed. Normally,distributed processing times and deterministic due dates are used in the experimentation. Various experiments are carried out to study the impacts of risk level, problem size and operation time variance on the optimal schedule. Proposed stochastic approach lets scheduler to sequence the jobs subject to an acceptable risk level. As the risk level increased, the number of jobs included in the schedule increased as well. Similarly, as the risk level increased, the probability of tardiness also increased especially for the jobs that are scheduled in the later positions. Unlike the deterministic model, the results of proposed approach are sensitive to the change in operation time variance. It is recommended to work with the safest schedule (0% risk), when the operation time variance is significantly high. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:136 / 143
页数:8
相关论文
共 60 条
[1]   A hierarchical model for the cell loading problem of cellular manufacturing systems [J].
Akturk, MS ;
Wilson, GR .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (07) :2005-2023
[2]   SCHEDULING ON A 2-MACHINE FLOWSHOP SUBJECT TO RANDOM BREAKDOWNS WITH A MAKESPAN OBJECTIVE FUNCTION [J].
ALLAHVERDI, A ;
MITTENTHAL, J .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) :376-387
[3]  
AlTurki UM, 1996, NAV RES LOG, V43, P573, DOI 10.1002/(SICI)1520-6750(199606)43:4<573::AID-NAV9>3.0.CO
[4]  
2-4
[5]  
Balut S. J., 1973, Management Science, V19, P1283, DOI 10.1287/mnsc.19.11.1283
[6]   Group technology based adaptive cell formation using predator-prey genetic algorithm [J].
Banerjee, Indranil ;
Das, Prasun .
APPLIED SOFT COMPUTING, 2012, 12 (01) :559-572
[7]   MINIMIZING THE EXPECTED WEIGHTED NUMBER OF TARDY JOBS IN STOCHASTIC FLOW SHOPS [J].
BOXMA, OJ ;
FORST, FG .
OPERATIONS RESEARCH LETTERS, 1986, 5 (03) :119-126
[8]  
Brown JR, 2014, J MANUF SYS IN PRESS
[9]  
Coffman E.G., 1989, Probability in the Engineering and Informational Sciences, V3, P89
[10]  
Egilmez G., 2012, MANUFACTURING SYSTEM, P381