Integrated Production and Delivery with Inventory Holding Costs

被引:1
作者
Agnetis, Alessandro [1 ]
Aloulou, Mohamed Ali [2 ,3 ]
Kovalyov, Mikhail Y. [4 ]
机构
[1] Univ Siena, Siena, Italy
[2] Unin Paris Dauphine, Paris, France
[3] Quintiq SAS, 16-18 Rue Londres, F-75009 Paris, France
[4] Natl Acad Sci Belarus, Minsk, BELARUS
关键词
Computational methods; Inventoriy control; Management systems; Manufacturing systems; Operations research; Scheduling algorithms; AIR-TRANSPORTATION; BATCH DELIVERY; COORDINATION; ALGORITHMS;
D O I
10.1016/j.ifacol.2016.07.891
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Supply chain coordination problems involve a number of actors, namely suppliers, manufacturers, 3PL providers, and customers. In a typical scenario, there are art manufacturers (modeled as single machines), each of which processes a specific set of jobs (products). After their processing is completed, products are shipped to a customer by means of vehicles. The set, of jobs assigned to the same vehicle in one delivery is a delivery batch. the problem consists in concurrently finding a production schedule of the jobs on the machines, a partition of jobs into delivery batches, and an assignment of delivery batches to vehicles, so that jobs are delivered within their deadlines and total costs are minimized. We focus on a scenario characterized by oil departure times and inventory holding costs. The former means that a set of departure times is given, and for each of therm there is a (given) number of vehicles, possibly having limited capacity. The latter means that each job incurs a cost proportional to the length of the time span from the job completion time to its delivery departure time. Within this general framework, in this paper we report complexity results concerning two special cases, namely (i) when each manufacturer imposes a certain production sequence to the 3PL, and (ii) when there is a single manufacturer, processing dines are all equal to I, there are no binding deadlines and there are no fixed delivery costs. (C) 2016, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All right reserved.
引用
收藏
页码:910 / 915
页数:6
相关论文
共 15 条
[1]   Two faster algorithms for coordination of production and batch delivery: A note [J].
Agnetis, Alessandro ;
Aloulou, Mohamed Ali ;
Fu, Liang-Liang ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 241 (03) :927-930
[2]   Coordination of production and interstage batch delivery with outsourced distribution [J].
Agnetis, Alessandro ;
Aloulou, Mohamed Ali ;
Fu, Liang-Liang .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 238 (01) :130-142
[3]   Integrated Production and Outbound Distribution Scheduling: Review and Extensions [J].
Chen, Zhi-Long .
OPERATIONS RESEARCH, 2010, 58 (01) :130-148
[4]   Coordinated scheduling of production and delivery with production window and delivery capacity constraints [J].
Fu, Bin ;
Huo, Yumei ;
Zhao, Hairong .
THEORETICAL COMPUTER SCIENCE, 2012, 422 :39-51
[5]   Scheduling with fixed delivery dates [J].
Hall, NG ;
Lesaoana, M ;
Potts, CN .
OPERATIONS RESEARCH, 2001, 49 (01) :134-144
[6]  
Jackson P. L., 2004, 1260 CORN U
[7]  
Lee CY, 2001, J SCHED, V4, P3, DOI 10.1002/1099-1425(200101/02)4:1<3::AID-JOS57>3.0.CO
[8]  
2-D
[9]   Integrated production and distribution with fixed delivery departure dates [J].
Leung, Joseph Y. -T. ;
Chen, Zhi-Long .
OPERATIONS RESEARCH LETTERS, 2013, 41 (03) :290-293
[10]  
Li K., 2015, EUR J OPER RES, V247, P756