Research of Automotive Change Management and Supportive Risk Management

被引:1
作者
Volker, Stephan [1 ]
Prostean, Gabriela [1 ]
Hutanu, Andrei [1 ]
机构
[1] Univ Timisoara, Timisoara, Romania
来源
SOFT COMPUTING APPLICATIONS, (SOFA 2014), VOL 2 | 2016年 / 357卷
关键词
Automotive change management; Risk management;
D O I
10.1007/978-3-319-18416-6_89
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
"Change Management" in automotive electronic control units (ECU) development project is one of the most important, but undervalued and understood tools to guarantee the success of a project. An ECU embedded within a car electronic environment is constantly under attack of a continuous flow of modifications of specifications throughout the development life cycle until start-of-production (SoP). Root causes for those modifications are, for instance, simply software or hardware implementation errors, improvement for robust design or requirement changes to satisfy the forthcoming demands of the market to ensure the later commercial success. Clearly, it is unavoidable that from the very beginning until the very end of the project "requirement changes" will "expose" the agreed objectives defined by contract specifications, which are product features, budget, schedule, and quality. The following investigation will assume that initially a feasibility study was undertaken to judge the general possibility to achieve the project objectives. Thus the key discussions will focus upon requirement changes or in the latter called RfC's (Request for Change) and their possible project risk. Building a thorough understanding of prospective threats is of paramount importance in order to establish the adequate project management process landscape to handle RfC's. In short, how to manage "risks" of RfC's. Moreover, this paper analyzes and identifies the constraints along the applied automotive Change-Management (CM) processes, reviewing the project life cycle of automotive projects. The research will not limit, bus focus on the investigation of changes during the early phase of the project: the concept-validation and debugging phase (see Fig. 1). In addition, clearly outlines frameworks of supportive processes to improve automotive CM practices with respect to risk management. The examined risk management process will visualize the in-and out-flow status of RfC's. In addition, deliver instruments to judge the carried risks of RfC have to meet agreed project objectives, consequently minimizing the risk.
引用
收藏
页码:1097 / 1108
页数:12
相关论文
共 50 条
[41]   Research for Risk Management of Construction Projects in Taiwan [J].
Lin, Chien-Liang ;
Chen, Bey-Kun .
SUSTAINABILITY, 2021, 13 (04) :1-15
[42]   Research on risk management of shipbuilding supply chain [J].
Yue Weihong ;
Zhang Qingying ;
Fan Haiqin .
PROCEEDINGS OF INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, 2008, :177-180
[43]   Research on Operational Risk Management of Insurance Company [J].
Wang Xujin .
PROCEEDINGS OF 2018 CHINA INTERNATIONAL CONFERENCE ON INSURANCE AND RISK MANAGEMENT, 2018, :247-253
[44]   The research of risk management of BOT investment project [J].
Chen Ling .
Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, :964-967
[45]   Research on the Risk Management Model of Dangerous Chemicals [J].
Qiu Ruilai ;
Zhang Yansong ;
Zhang Anming ;
Li Rui .
PROGRESS IN SAFETY MANAGEMENT RESEARCH AND PRACTICE, 2009, :212-216
[46]   Business Partnering in Risk Management: A Resilience Perspective on Management Accountants' Responses to a Role Change [J].
Tillema, Sandra ;
Trapp, Rouven ;
Van Veen-Dirks, Paula .
CONTEMPORARY ACCOUNTING RESEARCH, 2022, 39 (03) :2058-2089
[47]   EMPIRICAL RESEARCH REGARDING RISK AND RISK MANAGEMENT IN ROMANIAN JOURNALS [J].
Nichita, Elena Mirela .
IFRS: GLOBAL RULES & LOCAL USE, 2014, :148-161
[48]   Applying Risk Management to Mitigate the Consequences of Climate Change [J].
Mocuta, Dorina Nicoleta ;
Cristea, Stelica ;
Rahoveanu, Adrian Turek ;
Hossu, Ana Maria .
REVISTA DE CHIMIE, 2018, 69 (02) :415-418
[49]   Risk management of extreme events under climate change [J].
Yuan, Xiao-Chen ;
Wei, Yi-Ming ;
Wang, Bing ;
Mi, Zhifu .
JOURNAL OF CLEANER PRODUCTION, 2017, 166 :1169-1174
[50]   Climate change risk management: A Mental Modeling application [J].
Bridges T.S. ;
Kovacs D. ;
Wood M.D. ;
Baker K. ;
Butte G. ;
Thorne S. ;
Linkov I. .
Environment Systems and Decisions, 2013, 33 (3) :376-390