Optimal sizing of Battery Energy Storage Systems for dynamic frequency control in an islanded microgrid: A case study of Flinders Island, Australia

被引:101
作者
El-Bidairi, Kutaiba S. [1 ]
Hung Duc Nguyen [1 ]
Mahmoud, Thair S. [2 ]
Jayasinghe, S. D. G. [1 ]
Guerrero, Josep M. [3 ]
机构
[1] Univ Tasmania, Australian Maritime Coll, Coll Sci & Engn, Newnham, Tas 7248, Australia
[2] Edith Cowan Univ, Sch Engn, Joondalup, WA 6027, Australia
[3] Aalborg Univ, Inst Energy Technol, DK-9220 Aalborg, Denmark
关键词
Battery Energy Storage; Grey wolf optimization; Frequency response; Renewable energy sources; Stability; DIgSIENT PowerFactory; POWER-SYSTEMS; VIRTUAL INERTIA; DEMAND RESPONSE; SIZE OPTIMIZATION; VOLTAGE STABILITY; HIGH PENETRATION; MANAGEMENT; STRATEGY; GENERATOR; OPERATION;
D O I
10.1016/j.energy.2020.117059
中图分类号
O414.1 [热力学];
学科分类号
摘要
Challenging frequency control issues, such as the reliability and security of the power system, arise when increasing penetration levels of inverter-interfaced generation are imposed. As a result of the displacement of convention generation in favour of renewable energy sources, the reduction of frequency response capabilities can be seen. A promising method of overcoming the aforementioned challenges is to utilise Battery Energy Storage Systems (BESS), which provides frequency support by injecting instantaneous power to the grid and back up the conventional generation systems. However, large battery systems increase the cost while inadequate battery capacities result in poor performance. This paper, therefore, proposes an approach for finding the optimum BESS size for an islanded microgrid power system. The determination of the optimum BESS size is based on an existing case study, under which the most severe contingencies of generation loss and load loss have been accounted for, as well as different levels of penetration of renewable energy sources. As a result of using meta-heuristic optimization (Grey Wolf Optimization), the constraint optimization problem has been identified as BESS sizing. Through the use of real-time simulation DIgSILENT PowerFactory software, estimated BESS size can be applied to a standalone microgrid to test the frequency of support capabilities. The simulation has made it apparent that through the selection of the optimum BESS size, the system frequency response is not only mitigated, but improved. (C) 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页数:25
相关论文
共 57 条
  • [1] Adrees Atia, 2016, 2016 Power Systems Computation Conference (PSCC), P1, DOI 10.1109/PSCC.2016.7540912
  • [2] AEMO, FACT SHEET FREQ CONT
  • [3] Power management optimization of hybrid power systems in electric ferries
    Al-Falahi, Monaaf D. A.
    Nimma, Kutaiba S.
    Jayasinghe, Shantha D. G.
    Enshaei, Hossein
    Guerrero, Josep M.
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2018, 172 : 50 - 66
  • [4] A review on recent size optimization methodologies for standalone solar and wind hybrid renewable energy system
    Al-Falahi, Monaaf D. A.
    Jayasinghe, S. D. G.
    Enshaei, H.
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2017, 143 : 252 - 274
  • [5] Alhejaj SamirM., 2016, 2016 IEEE International Conference on Power System Technology (POWERCON), P1
  • [6] [Anonymous], P 2 C IBEROAMERICANO
  • [7] [Anonymous], 2016, 2016 IEEE 2 ANN SO P
  • [8] [Anonymous], GUID ANC SERV NAT EL
  • [9] [Anonymous], 1994, POWER SYSTEM STABILI
  • [10] Apostolopoulou D., 2013, PROC 9 BULK POWER SY, P1