Efficient scheduling rules in a combined make-to-stock and make-to-order manufacturing system

被引:39
作者
Youssef, KH
Van Delft, C
Dallery, Y
机构
[1] Ecole Cent Paris, Lab Genie Ind, F-92295 Chatenay Malabry, France
[2] Grp HEC, Dept Management Ind & Logist, F-78351 Jouy En Josas, France
关键词
make-to-order (MTO); make-to-stock (MTS); first-in-first-out; priority; heterogeneous multiproduct queueing system;
D O I
10.1023/B:ANOR.0000012277.97069.a6
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider a mixed MTS/MTO policy to manage a single manufacturing facility producing two classes of end-products. A few end-products have high volume demands, whereas a fairly large number of end-products have low volume demands. In this situation, it is appealing to try to produce the high volume products according to an MTS policy and the low volume products according to an MTO policy. The purpose of this paper is to analyze and compare the impact of the choice of the scheduling policy on the overall performance of the system. We consider two policies: the classical FIFO policy and a priority policy (PR). The PR policy gives priority to production orders corresponding to low volume products over production orders corresponding to high volume products. Under some simple stochastic modeling assumptions, we develop analytical/numerical solutions to optimise each system. We then provide insights regarding this issue with the help of numerical examples. It appears that for some range of parameters, the PR rule can outperform the FIFO rule in the sense that, to achieve the same service level constraint, the corresponding cost under the PR rule is much lower. This situation is encountered when the low volume products can be managed with an MTO policy under the PR scheduling rule, while they have to be managed according to an MTS policy under the FIFO scheduling rule. We also derive some theoretical properties that support our empirical findings.
引用
收藏
页码:103 / 134
页数:32
相关论文
共 20 条
[1]  
ARREOLARISA A, 1998, IIE T, P705
[2]  
Buzacott J.A., 1993, STOCHASTIC MODELS MA
[3]   Optimal admission control and sequencing in a make-to-stock/make-to-order production system [J].
Carr, S ;
Duenyas, I .
OPERATIONS RESEARCH, 2000, 48 (05) :709-720
[4]   The stochastic Economic Lot Scheduling Problem: Cyclical base-stock policies with idle times [J].
Federgruen, A ;
Katalan, Z .
MANAGEMENT SCIENCE, 1996, 42 (06) :783-796
[5]   The impact of adding a make-to-order item to a make-to-stock production system [J].
Federgruen, A ;
Katalan, Z .
MANAGEMENT SCIENCE, 1999, 45 (07) :980-994
[6]   Determining production schedules under base-stock policies in single facility multi-item production systems [J].
Federgruen, A ;
Katalan, Z .
OPERATIONS RESEARCH, 1998, 46 (06) :883-898
[7]  
FEDERGRUEN A, 1995, MAKE STOCK MAKE ORDE
[8]  
Feldman R.M., 1996, APPL PROBABILITY STO
[9]  
Kleinrock L., 1975, Queuing Systems, VI
[10]  
Kleinrock L., 1976, QUEUING SYSTEMS