Scheduling of multistage multiproduct chemical batch plants using a constraint-based approach

被引:4
作者
Huang, W [1 ]
Chung, PWH [1 ]
机构
[1] Univ Loughborough, Dept Chem Engn, Loughborough LE11 3TU, Leics, England
关键词
schedule; chemical batch plants; activity; constraints; constraint satisfaction techniques;
D O I
10.1016/S0098-1354(99)80126-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Multistage multiproduct chemical batch plants provide great flexibility but the task of scheduling them to meet product demands can be challenging. A typical scheduling problem involves the allocation of resources over time. A constraint-based approach to solve this kind of scheduling problems is considered. The essential feature of this approach is that it does not require elaborate mathematical formulae, but it requires a problem to be stated in terms of constraints. A general constraint model was created to represent a common class of chemical batch plants and a scheduling system was produced based on this model. A user can simply input the information of production requirements through a user interface and, if necessary, modify the constraints related to the specific problem and a viable schedule is created automatically.
引用
收藏
页码:S511 / S514
页数:4
相关论文
共 3 条
  • [1] A GENERAL ALGORITHM FOR SHORT-TERM SCHEDULING OF BATCH-OPERATIONS .1. MILP FORMULATION
    KONDILI, E
    PANTELIDES, CC
    SARGENT, RWH
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 1993, 17 (02) : 211 - 227
  • [2] Shah N., 1993, Annals of Operations Research, V42, P193, DOI 10.1007/BF02023176
  • [3] A framework of constraint-based modeling for cooperative decision systems
    Wang, HQ
    Liao, LJ
    [J]. KNOWLEDGE-BASED SYSTEMS, 1997, 10 (02) : 111 - 120