Investigation of the effect of the quality of inspection techniques on the optimal inspection interval for structures

被引:27
作者
Sheils, E. [1 ]
O'Connor, A. [1 ]
Schoefs, F. [2 ]
Breysse, D. [3 ]
机构
[1] Trinity Coll Dublin, Dept Civil Engn, Dublin 2, Ireland
[2] Nantes Atlantic Univ, UMR CNRS 6183, Inst Civil & Mech Res GeM, F-44322 Nantes 03, France
[3] Univ Bordeaux 1, GHYMAC, F-33405 Talence, France
关键词
detection; inspection; maintenance; Markov; sizing; LIFE-CYCLE COST; BRIDGE MANAGEMENT; HIGHWAY BRIDGES; MAINTENANCE; OPTIMIZATION;
D O I
10.1080/15732479.2010.505377
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Quantitative data from inspections are necessary to determine the state of a deteriorating structure and to identify the optimal maintenance strategy for the remaining life of the structure. This article presents the development of a two-stage inspection based maintenance management framework, which provides the owner/manager of a structure with a decision tool to optimise the service life costs of a structure. The two stages of an inspection are considered here, detection of defects present and sizing of detected defects. Using this framework, the optimal inspection interval for this study, based on the minimisation of the service life costs, is determined and the effect of inspection quality of the two techniques is studied. By modelling the detection and sizing stage of an inspection separately, the optimum combination of techniques can be determined.
引用
收藏
页码:557 / 568
页数:12
相关论文
共 35 条
[1]  
ADEY B, 2003, P 2 INT RILEM WORKSH, P373
[2]  
Ang A. H.-S., 1984, PROBABILITY CONCEPTS, Vii
[3]  
Ang AHS, 1975, Basic Principles, V1
[4]  
[Anonymous], 1987, Proceedings of the Marine Structural Reliability Symposium, SSC/SNAME
[5]  
Bakht B., 2005, P 5 INT C BRIDG MAN, P37
[6]   MODELING BRIDGE DETERIORATION WITH MARKOV-CHAINS [J].
CESARE, MA ;
SANTAMARINA, C ;
TURKSTRA, C ;
VANMARCKE, EH .
JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1992, 118 (06) :820-833
[7]   Optimal inspection scheduling of steel bridges using nondestructive testing techniques [J].
Chung, Hsin-Yang ;
Manuel, Lance ;
Frank, Karl H. .
JOURNAL OF BRIDGE ENGINEERING, 2006, 11 (03) :305-319
[8]   Modeling of risk-based inspection, maintenance and life-cycle cost with partially observable Markov decision processes [J].
Corotis, Ross B. ;
Ellis, J. Hugh ;
Jiang, Mingxiang .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2005, 1 (01) :75-84
[9]  
Czepiel E., 1995, 11 NW U INFR TECHN I
[10]  
Duffy L., 2004, PROC INST CIV ENG-BR, V157, P139, DOI [10.1680/bren.2004.157.3.139, DOI 10.1680/BREN.2004.157.3.139]