Geotechnical design for the Port Botany expansion project, Sydney

被引:8
|
作者
Davies, Philip R. E. [1 ]
McIlquham, James D. [1 ]
机构
[1] Golder Associates Pty Ltd, Sydney, NSW, Australia
关键词
ground improvement rehabilitation; reclamation & renovation; retaining walls;
D O I
10.1680/geng.10.00052
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
This paper describes ground treatments, foundation preparations and geotechnical design for extensive reclamations and retaining structures forming the Port Botany expansion project in Sydney, Australia. The 63 ha reclamation, up to 30 m deep, is constructed from dredged Botany Bay sands, which are retained by over two hundred 20 m high counterfort and blockwork gravity wall units. These berth structures are founded on vibrocompacted sand backfill placed within a submerged trench excavated into natural fissured clays. The design involved detailed assessment of stability and movement behaviour for the reclamation and berth structures. Geotechnical compliance testing criteria were developed for reclamation fill materials to provide compaction and material quality assurance. In particular, acceptance criteria for berth structure foundations and retained backfill were developed to verify the strength and stiffness of fills so as to meet design requirements at key time milestones following handover of the works. The main fill verification tool utilised cone penetration tests, for which screening rules and site-specific acceptance criteria were developed. Methods of fill compaction included dynamic compaction, vibrocompaction and impact roller compaction. The relative performance of these methods is discussed, along with compliance testing results, effects of vibrocompaction on wall structures, fill variability and actual compared with predicted performance of compacted sand fills.
引用
收藏
页码:149 / 167
页数:19
相关论文
共 50 条
  • [1] Port Botany expansion project, Sydney, Australia: design and construction of counterfort retaining walls
    Packer, David
    Masters, Peter
    Riordan, Greg
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2013, 166 (05) : 10 - 14
  • [2] MARINE AND LAND BASED COMPACTION WORKS AT THE PORT BOTANY PROJECT, SYDNEY
    Berthier, D.
    Debats, J. M.
    Scharff, G.
    Vincent, P.
    GROUND IMPROVEMENT TECHNOLOGIES AND CASE HISTORIES, 2010, : 221 - 229
  • [3] Geotechnical design and construction of Port of Brisbane Motorway Upgrade project
    Evans, Richard
    Tran, Van Hai
    Australian Geomechanics Journal, 2013, 48 (01): : 121 - 131
  • [4] The Botany School of the University of Sydney
    不详
    NATURE, 1927, 119 : 509 - 510
  • [5] Container Ports Post-Privatisation - Analysis of the roles of the public and private sectors at Port Botany, Sydney
    Black, John
    Roso, Violeta
    CASE STUDIES ON TRANSPORT POLICY, 2022, 10 (02) : 1438 - 1452
  • [6] The Rio Grande Port breakwater, Brazil: geotechnical design
    Schnaid, Fernando
    Dienstmann, Gracieli
    de Mello, Luiz Guilherme
    Sandroni, Sandro
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2013, 166 (06) : 56 - 61
  • [7] Geotechnical aspects of the design of the containment area of the port of Gaeta
    de Lillis, Armando
    Miliziano, Salvatore
    ITALIAN GEOTECHNICAL JOURNAL-RIVISTA ITALIANA DI GEOTECNICA, 2016, 50 (04): : 3 - 22
  • [8] Innovative investigation techniques used for geotechnical modelling of the Northside Storage Tunnel Project, Sydney
    Parker, C
    Whiteley, B
    Gee, B
    10TH AUSTRALIAN TUNNELLING CONFERENCE - THE RACE FOR SPACE: PROCEEDINGS, 1999, 99 (02): : 193 - 205
  • [9] PATRICK STEVEDORES' CLIENT-SIDE PROJECT MANAGEMENT AT PORT BOTANY RAMP D
    Diacos, Emmanuel
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 539 - 543
  • [10] BOTANY BAY PROJECT
    HANCOCK, WK
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL STUDIES, 1979, 14 (01) : 27 - 36