DEVELOPMENT OF INTELLIGENT MODEL FOR ESTIMATING MANUFACTURING COST IN SHEET METALWORKING

被引:0
作者
Rimasauskas, M. [1 ]
Bargelis, A. [1 ]
机构
[1] Kaunas Univ Technol, LT-44312 Kaunas, Lithuania
来源
PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE OF DAAAM BALTIC INDUSTRIAL ENGINEERING, VOLS 1 AND 2 | 2010年
关键词
neural network; cost forecasting; laser cutting;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In modern manufacturing, high product quality, manufacturing flexibility and low production cost are main keys to competitiveness. For this reason, manufacturing cost is always the point of primary concern. Basically, the manufacturing cost of a sheet metal part is determined by its shape complexity, perimeter, size, a number of design features, material properties and thickness. If these data can be obtained and considered in a design stage, estimation of manufacturing cost during the early design stage will be a feasible task. This research submits a framework for estimating the manufacturing cost in sheet metalworking. The manufacturing cost estimation method is based on Artificial Neural Networks (ANN). ANN is helpful in the situations when conventional linear regression does not work. The obtained results have been considered, discussed and appropriate conclusions have been drawn.
引用
收藏
页码:251 / 256
页数:6
相关论文
共 13 条
[1]  
Al-Najjar B., 2000, Integrated Manufacturing Systems, V11, P267, DOI 10.1108/09576060010326393
[2]   Cost forecasting model for order-based sheet metalworking [J].
Bargelis, A. ;
Rimasauskas, M. .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2007, 221 (01) :55-65
[3]   Hybrid forming process of AA 6108 T4 thin sheets: modelling by neural network solutions [J].
Barletta, M. ;
Gisario, A. ;
Guarino, S. .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2009, 223 (05) :535-545
[4]   An ANN-based DSS system for quality assurance in production network [J].
Chung, Walter W. C. ;
Wong, Kevin C. M. ;
Soon, Paul T. K. .
JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2007, 18 (07) :836-857
[5]  
Geiger M., 1998, PRODUCTION ENG, V2, P81
[6]   IMPROVING PRODUCTIVITY AND QUALITY IN MANUFACTURING ORGANIZATIONS [J].
GUNASEKARAN, A ;
KORUKONDA, AR ;
VIRTANEN, I ;
YLIOLLI, P .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 36 (02) :169-183
[7]  
Hu Y. H., 2002, HDB NEURAL NETWORK S
[8]   Manufacturing cost estimation for machined parts based on manufacturing features [J].
Jung, JY .
JOURNAL OF INTELLIGENT MANUFACTURING, 2002, 13 (04) :227-238
[9]  
Meziane F., 2000, Integrated Manufacturing Systems, V11, P218, DOI 10.1108/09576060010326221
[10]  
SHEHAB EM, 2002, ROBOTICS COMPUTER IN, V17, P341