Starting up rapid-start units for reserve contributions in a system with interruptible loads

被引:10
作者
Toh, G. K. [1 ]
Gooi, H. B. [1 ]
机构
[1] Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore
关键词
DEMAND-SIDE; GAS-TURBINE; GENERATION; MARKET;
D O I
10.1049/iet-gtd.2010.0808
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This study presents the effect of starting reliability of rapid-start units (RSUs), such as open-cycle gas turbines (OCGTs) and hydro generators, for energy scheduling and reserve allocation. A method that explicitly integrates unit starting reliability into the expected energy not served (EENS) formulation for non-spinning reserve (NR) contribution is proposed. A unit commitment objective function is used to incorporate the various types of energy/reserve providers and to schedule energy and reserve simultaneously. These providers are conventional thermal units, OCGTs, hydro units and interruptible loads. An EENS model that considers these energy/reserve providers and accounts for their response times is presented pictorially. A penalty cost formulation for RSUs that failed to start up for NR contribution is proposed. This work emphasises the importance of modelling units of varying starting reliability. These results could be used to assist independent system operators and generation companies when selecting energy/reserve sources for power generation and reserve contribution.
引用
收藏
页码:1081 / 1090
页数:10
相关论文
共 25 条
[1]   Unit Commitment With Probabilistic Spinning Reserve and Interruptible Load Considerations [J].
Aminifar, Farrokh ;
Fotuhi-Firuzabad, Mahmud ;
Shahidehpour, Mohammad .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (01) :388-397
[2]  
ANSTINE LT, 1963, IEEE T PAS, V82, P726, DOI DOI 10.1109/TPAS.1963.291390
[3]   A probabilistic reserve market incorporating interruptible load [J].
Bai, J. ;
Gooi, H. B. ;
Xia, L. M. ;
Strbac, G. ;
Venkatesh, B. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (03) :1079-1087
[4]   GENERATING-SYSTEM OPERATING HEALTH ANALYSIS CONSIDERING STANDBY UNITS, INTERRUPTIBLE LOAD AND POSTPONABLE OUTAGES [J].
BILLINTON, R ;
FOTUHIFIRUZABAD, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (03) :1618-1625
[5]   OPERATING RESERVE ASSESSMENT IN INTERCONNECTED GENERATING SYSTEMS [J].
BILLINTON, R ;
CHOWDHURY, NA .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (04) :1479-1487
[6]  
Billinton R., 1994, RELIABILITY EVALUATI, DOI DOI 10.1007/978-1-4615-7731-7
[7]   An electricity market with a probabilistic spinning reserve criterion [J].
Bouffard, F ;
Galiana, FD .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (01) :300-307
[8]   RELIABILITY AVAILABILITY GUARANTEES OF GAS-TURBINE AND COMBINED-CYCLE GENERATING-UNITS [J].
EKSTROM, TE .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 1995, 31 (04) :691-707
[9]  
Floudas C. A., 1995, Nonlinear and Mixed-Integer Optimization: Fundamentals and Applications
[10]   The IEEE reliability test system - 1996 [J].
Grigg, C ;
Wong, P ;
Albrecht, P ;
Allan, R ;
Bhavaraju, M ;
Billinton, R ;
Chen, Q ;
Fong, C ;
Haddad, S ;
Kuruganty, S ;
Li, W ;
Mukerji, R ;
Patton, D ;
Rau, N ;
Reppen, D ;
Schneider, A ;
Shahidehpour, M ;
Singh, C .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) :1010-1018