共 26 条
[1]
*AASHTO, 1999, STAND SPEC
[3]
Scheduling cost optimization and neural dynamics model for construction
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1997, 123 (04)
:450-458
[4]
Adeli H., 1996, Microcomputers in Civil Engineering, V11, P355
[6]
Cost optimization of composite floors using neural dynamics model
[J].
COMMUNICATIONS IN NUMERICAL METHODS IN ENGINEERING,
2001, 17 (11)
:771-787
[7]
COUNTERPROPAGATION NEURAL NETWORKS IN STRUCTURAL-ENGINEERING
[J].
JOURNAL OF STRUCTURAL ENGINEERING-ASCE,
1995, 121 (08)
:1205-1212
[8]
Adeli H., 1999, DISTRIBUTED COMPUTER
[9]
Adeli H., 2001, Construction scheduling, cost optimization and management
[10]
Adeli H., 1998, Neurocomputing in Design Automation