The influence of the borehole short-time response on ground source heat pump system efficiency

被引:13
作者
Partenay, Vincent [1 ]
Riederer, Peter [1 ]
Salque, Tristan [1 ]
Wurtz, Etienne [2 ]
机构
[1] Ctr Sci & Tech Batiment, F-06904 Sophia Antipolis, France
[2] Univ Savoie, Lab LOCIE, F-73376 Le Bourget Du Lac, France
关键词
Ground coupled heat pump; Ground heat exchangers; Dynamic simulation; Geothermal heat pump;
D O I
10.1016/j.enbuild.2011.01.009
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Ground coupled heat pump systems can offer high energy efficiency for heating and cooling of buildings. The coupling of the ground loop with system and building represents a complex system and system performances can vary over long periods, in the range of 10-15 years due to the charge or discharge of the ground loop. In order to correctly concept, size and optimise these systems, numerical simulation is a perfect tool. The assessment of the global performance of such systems through simulation relies on several parameters, from the physical model validity to the operating conditions and control of the system. Typically, a GCHP system is simulated with a 1-h step. Transient phenomena inside the borehole are often neglected since ground models are mainly developed to characterise long term phenomena. However, detailed system simulations considering a realistic control of the system require much smaller time steps. In these cases, the validity of simulation models has to be verified. This paper proposes a hybrid approach combining experiments and simulation to highlight and quantify the impact of borehole short-time response on the system efficiency and system operation. First, a comparison between steady state and transient models as well as measurement is carried out. It reveals significant influence of dynamic effects inside the borehole. The comparison is then extended a parametric study with annual simulations for different European climates. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:1280 / 1287
页数:8
相关论文
共 16 条
[1]  
*CSTB, 2004, SIMBAD BUILD HVAC TO
[2]   Numerical analysis and experimental validation of heat transfer in ground heat exchangers in alternative operation modes [J].
Cui, P. ;
Yang, H. ;
Fang, Z. .
ENERGY AND BUILDINGS, 2008, 40 (06) :1060-1066
[3]  
ELKHOURY Z, 2005, MULTIZONE BUILDING M
[4]  
ESKILSON, 1987, THESIS U LUND LUND S
[5]  
Hellstrom G., 1991, Doctoral thesis
[6]  
Hellstrom G., 1989, Duct ground heat storage model, manual for computer code
[7]  
Incropera F.P., 1998, FUNDAMENTALS HEAT MA, V4th
[8]  
INGERSOLL LR, 1948, HEATING PIPING AIR C
[9]   Sub-hourly simulation of residential ground coupled heat pump systems [J].
Kummert, Michael ;
Bernier, Michel .
BUILDING SERVICES ENGINEERING RESEARCH & TECHNOLOGY, 2008, 29 (01) :27-44
[10]  
*MATHW INC, 2007, MATLAB VERS R2007A