Evaluation Research on policy risk of BOT project in Expressway Based on Structural Equation

被引:0
作者
Bing, Xu [1 ]
Lu, Liu [1 ]
机构
[1] N China Univ Technol, Sch Econ & Management, Beijing 100144, Peoples R China
来源
REGIONAL DEVELOPMENT AND RISK MANAGEMENT IN THE WEST OF CHINA | 2012年
关键词
Structural equation; Policy risk; BOT;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Due to large capital investment and long time span, there are big risks on BOT project. In all of them, the policy risk prediction is the most difficult. This paper takes the policy risk of BOT project as research object, and establishes the evaluation index system of policy risk and structural equation with the structural equation approach. And fitting tests and model parameter estimation are done through the data of questionnaires. Besides, analyze the influence of various factors of policy risks and the relationship among policy risk factors. This paper provides a reference way for quantitative evaluation of the policy risk of BOT project.
引用
收藏
页码:165 / 171
页数:7
相关论文
共 7 条
[1]  
FENG Ning, 2010, NO COMMUNICATIONS, V6, P126
[2]   Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach [J].
Kang, CC ;
Feng, CM ;
Khan, HA .
COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (06) :1633-1654
[3]  
Kumaraswamy M.M., 2001, International Journal of Project Management, V19, P195, DOI DOI 10.1016/S0263-7863(99)00069-1
[4]  
UNIDO, 1996, GUID INFR DEV BOT PR
[5]   Evaluation and management of political risks in China's bot projects [J].
Wang, SQ ;
Tiong, RLK ;
Ting, SK ;
Ashley, D .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (03) :242-250
[6]  
WANG Xue-qing, 1999, J TIANJIN U SOCIAL S, V1, P266
[7]  
YANG Yaqi, 2008, TECHNOLOGY WIND, V14, P45