Cost Analysis of Synchronous Condenser Transformed from Thermal Unit Based on LCC Theory

被引:7
作者
Li, Chenghao [1 ]
Liu, Mingyang [1 ]
Guo, Yi [2 ]
Ma, Hanqing [2 ]
Wang, Hua [1 ]
Yuan, Xiaoling [2 ]
机构
[1] State Grid Henan Elect Power Res Inst, Zhengzhou 450052, Peoples R China
[2] Hohai Univ, Coll Energy & Elect Engn, Nanjing 211100, Peoples R China
关键词
synchronous condenser transformed from thermal unit (SCTTU); newly established synchronous condenser (NESC); life-cycle cost (LCC); blind number theory;
D O I
10.3390/pr10091887
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
With the development of large-scale renewable energy consumption and multi-infeed high voltage direct current (HVDC) systems, the demand of a system for the synchronous condensers with a strong dynamic reactive power support capacity and a strong short-time overload capacity is increasing. Meanwhile, with the reuse of a large number of retired thermal units, the most practical and economic way is to transform thermal units into synchronous condensers. The cost difference in the life-cycle of the synchronous condenser transformed from a thermal unit (SCTTU) and the newly established synchronous condenser (NESC) is a key factor that affects the decision-making and construction of the transformation from thermal unit to synchronous condenser. However, the life-cycle cost (LCC) of the synchronous condenser transformed from a thermal unit and the newly established synchronous condenser contains many uncertain factors, which affect the accuracy of the LCC estimation value. In order to quantify the impact of the blind information on the cost of the synchronous condenser station, blind number theory is introduced to establish the blind number model of the LCC of the synchronous condenser transformed from a thermal unit and the newly established synchronous condenser. Additionally, the LCC of the NESC and SCTTU with a different life-cycle under the capacity of 2 x 300 MVar are estimated. The results show that the cost of the SCTTU with a long service life of more than 15 years is significantly lower than that of the NESC and, thus, the SCTTU has better economic performance. The economic performance of the SCTTU with a life-cycle of less than 15 years is not better than that of the NESC. Compared with the traditional calculation method of a single cost value, the blind number model can obtain the possible distribution interval of LCC and the reliability of the corresponding interval, which makes the estimation results more valuable for practical engineering reference.
引用
收藏
页数:16
相关论文
共 25 条
[1]  
An J., 2022, P 2022 7 ASIA C POWE
[2]  
baidu, PROJECT MANAGEMENT I
[3]  
Chaturvedi DK, 2019, V8, P12
[4]  
docin, ENV IMPACT REPORT JI
[5]   Optimal Allocation and Sizing of Synchronous Condensers in Weak Grids With Increased Penetration of Wind and Solar Farms [J].
Hadavi, Sajjad ;
Mansour, Milad Zarif ;
Bahrani, Behrooz .
IEEE JOURNAL ON EMERGING AND SELECTED TOPICS IN CIRCUITS AND SYSTEMS, 2021, 11 (01) :199-209
[6]   ACT on RE plus FLEX: Accelerating Coal Transition Through Repurposing Coal Plants Into Renewable and Flexibility Centers [J].
Huang, Ziting ;
Smolenova, Ivana ;
Chattopadhyay, Debabrata ;
Govindarajalu, Chandrasekhar ;
De Wit, Joeri ;
Remy, Tom ;
Curiel, Ilka Deluque .
IEEE ACCESS, 2021, 9 :84811-84827
[7]  
Jiang Z., 2022, SHANDONG ELECT POWER, V49, P17
[8]  
Kaur J., 2018, IEEE POW ENER SOC GE
[9]  
Lin J, 2018, MATH PRACT THEORY, V48, P1
[10]  
Lin L., 2021, POWER SYST CLEAN ENE, V37, P107