Donor-driven resource procurement for post-disaster reconstruction: Constraints and actions

被引:48
作者
Chang, Yan [1 ]
Wilkinson, Suzanne [2 ]
Potangaroa, Regan [3 ]
Seville, Erica [4 ]
机构
[1] Univ Auckland, Dept Civil & Environm Engn, Auckland Mail Ctr, Auckland 1142, New Zealand
[2] Univ Auckland, Dept Civil & Environm Engn, Auckland 1061, New Zealand
[3] UNITEC, Sch Architecture ScALA, Auckland, New Zealand
[4] Univ Canterbury, Dept Civil Engn, Christchurch 8140, New Zealand
关键词
Resource procurement; Resource availability; Post-tsunami reconstruction; Housing; Donors; Indonesia; COMMUNITY PARTICIPATION; SUPPLY CHAIN; TRADE-OFF; CONSTRUCTION; ACEH; PERFORMANCE; COST;
D O I
10.1016/j.habitatint.2010.08.003
中图分类号
F0 [经济学]; F1 [世界各国经济概况、经济史、经济地理]; C [社会科学总论];
学科分类号
0201 ; 020105 ; 03 ; 0303 ;
摘要
Post-disaster reconstruction suffers bottlenecks and challenges due to the inadequacies of resource procurement. In the aftermath of the 2004 Indian Ocean tsunami, difficulties in acquiring resources compromised donors' efforts in achieving a successful recovery. By drawing on in-field observations and surveys in Banda Aceh, Indonesia, this paper identifies the key factors that obstructed the process for NGOs to procure building materials and labour. The result demonstrates that donor-driven resource procurement was primarily impeded by (1) NGO-related factors including: NGOs competency of resource procurement and competition for resources among aid agencies; (2) external hurdles in NGOs implementing environment including: low local transportation and supply capacity, incompetence of contractor, and insufficient government support; and (3) community-related factors including: local housing culture and lack of community influence and participation. Continuous capacity building in NGOs, proactive resource assessment and planning, strengthening relationships with local community and institutions, together with a collaborative resourcing approach are likely to address resourcing constraints faced by NGOs when rebuilding communities following a disaster. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:199 / 205
页数:7
相关论文
共 50 条
[1]  
Agapious A., 1998, CONSTR MANAG ECON, V16, P351
[2]  
Alexander D., 2004, 1 REC 2004 INT C IMP
[3]  
[Anonymous], 43 ISOCARP C URB TRI
[4]  
Asian Development Bank, 2007, PROP LOAN REC CEM PR
[5]  
Bailey S., 2008, A report commissioned by World Vision International
[6]   Building a conceptual framework for measuring business performance in construction: an empirical evaluation [J].
Bassioni, H. A. ;
Price, A. D. F. ;
Hassan, T. M. .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (05) :495-507
[7]   Performance measurement in construction [J].
Bassioni, HA ;
Price, ADF ;
Hassan, TM .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2004, 20 (02) :42-50
[8]  
Belassi W., 1996, International Journal of Project Management, V14, P141, DOI [https://doi.org/10.1016/0263-7863(95)00064-X, DOI 10.1016/0263-7863(95)00064-X]
[9]   RECOVERY AFTER DISASTER - ACHIEVING SUSTAINABLE DEVELOPMENT, MITIGATION AND EQUITY [J].
BERKE, PR ;
KARTEZ, J ;
WENGER, D .
DISASTERS, 1993, 17 (02) :93-109
[10]  
Birkland T.A., 2006, LESSONS DISASTER