Railway bridge approaches under heavy axle load traffic: problems, causes, and remedies

被引:40
作者
Li, D. [1 ]
Otter, D. [1 ]
Carr, G. [2 ]
机构
[1] Assoc Amer Railroads, Transportat Technol Ctr, Pueblo, CO 81001 USA
[2] Fed Railroad Adm, Washington, DC USA
关键词
bridge; bridge approach; root cause; remedy; TRANSITION;
D O I
10.1243/09544097JRRT345
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article presents findings from projects conducted by the Transportation Technology Center, Inc. concerning track maintenance problems associated with bridge approaches of railway track. Field tests for determining root causes of, and evaluating remedies for, such problems were conducted at the Facility for Accelerated Service Testing near Pueblo, Colorado, and at a number of revenue service sites in the United States. Investigations covered ballast deck concrete bridges with concrete ties, open deck steel bridges with wood ties, and their approaches.
引用
收藏
页码:383 / 390
页数:8
相关论文
共 18 条
[1]  
AKHTAR M, 2008, STRESS STATE REDUCTI
[2]  
Davis D, 2005, LONG TERM PERFORMANC
[3]  
Davis D.D., 2003, RAILWAY TRACK STRUCT, V99, P18
[4]  
Hoppe EJ, 2001, ROUTES ROADS, V312, P24
[5]  
HYSLIP J, 2009, P 8 INT C BEAR CAP R, P1341
[6]   Dynamic response analyses of vehicle and track coupled system on track transition of conventional high speed railway [J].
Lei, XY ;
Mao, LJ .
JOURNAL OF SOUND AND VIBRATION, 2004, 271 (3-5) :1133-1146
[7]  
LI D, 2007, TD07042 TRANSP TECHN
[8]  
LI D, 2006, INVESTIGATION OPEN D
[9]  
LI D, TD03013 TRANSP TECHN
[10]  
LI D, 2007, RAILW TRACK STRUCT, V103, P18