Rule-Based Scheduling of Single-Stage Multiproduct Batch Plants with Parallel Units

被引:14
作者
Shi, Bin [2 ]
Yan, Lie-Xiang [2 ]
Wu, Wei [1 ]
机构
[1] Natl Cheng Kung Univ, Dept Chem Engn, Tainan 70101, Taiwan
[2] Wuhan Univ Technol, Sch Chem Engn, Wuhan 430070, Peoples R China
关键词
UP COMPETITION ALGORITHM; LINEAR-PROGRAMMING MODEL; CONTINUOUS-TIME; MIXED-INTEGER; OPTIMIZATION PROBLEMS; CHEMICAL-PROCESSES; GENETIC ALGORITHM; MILP MODEL;
D O I
10.1021/ie300217a
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
A new rule-based model for single-stage multiproduct scheduling problem (SMSP) in batch plants with parallel units is proposed. The scheduling problem is decomposed into two subproblems of order assignment and order sequencing. A group of order assignment rules are introduced to select suitable units for customer orders. While flexible constraint handling strategies are proposed to eliminate the constraints of forbidden units and unit release times and convert the hard constraint of forbidden sequences to a soft one, leading to any arbitrary order sequence can be synthesized into a legal schedule. The line-up competition algorithm (LUCA) is presented to obtain optimal order sequence and order assignment rule, which can minimize makespan, total tardiness, or total cost. Through comparative study, the proposed approach has demonstrated its effectiveness for solving a large size SMSP.
引用
收藏
页码:8535 / 8549
页数:15
相关论文
共 28 条
[1]   An efficient MILP model for the short-term scheduling of single stage batch plants [J].
Castro, Pedro A. ;
Grossmann, Ignacio E. .
COMPUTERS & CHEMICAL ENGINEERING, 2006, 30 (6-7) :1003-1018
[2]   Two new continuous-time models for the scheduling of multistage batch plants with sequence dependent changeovers [J].
Castro, Pedro M. ;
Grossmann, Ignacio E. ;
Novais, Augusto Q. .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2006, 45 (18) :6210-6226
[3]   A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines [J].
Cerda, J ;
Henning, GP ;
Grossmann, IE .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1997, 36 (05) :1695-1707
[4]   Optimal short-term scheduling of multiproduct single-stage batch plants with parallel lines [J].
Chen, CL ;
Liu, CL ;
Feng, XD ;
Shao, HH .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2002, 41 (05) :1249-1260
[5]   Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review [J].
Floudas, CA ;
Lin, XX .
COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (11) :2109-2129
[6]   Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods [J].
Harjunkoski, I ;
Grossmann, IE .
COMPUTERS & CHEMICAL ENGINEERING, 2002, 26 (11) :1533-1552
[7]   A rule-based genetic algorithm for the scheduling of single-stage multi-product batch plants with parallel units [J].
He, Yaohua ;
Hui, Chi-Wai .
COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (12) :3067-3083
[8]   Genetic algorithm based on heuristic rules for high-constrained large-size single-stage multi-product scheduling with parallel units [J].
He, Yaohua ;
Hui, Chi-Wai .
CHEMICAL ENGINEERING AND PROCESSING-PROCESS INTENSIFICATION, 2007, 46 (11) :1175-1191
[9]   Automatic rule combination approach for single-stage process scheduling problems [J].
He, Yaohua ;
Hui, Chi-Wai .
AICHE JOURNAL, 2007, 53 (08) :2026-2047
[10]   Rule-evolutionary approach for single-stage multiproduct scheduling with parallel units [J].
He, Yaohua ;
Hui, Chi-Wai .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2006, 45 (13) :4679-4692