共 50 条
Design of the ITER First Wall and Blanket
被引:0
|作者:
Raffray, A. Rene
[1
]
Merola, Mario
[1
]
机构:
[1] ITER Org, TKM, Internal Components Div, 524-026 Route Vinon Verdon, F-13115 St Paul Les Durance, France
来源:
2011 IEEE/NPSS 24TH SYMPOSIUM ON FUSION ENGINEERING (SOFE)
|
2011年
关键词:
ITER;
blanket system;
first wall;
PLASMA-FACING COMPONENTS;
D O I:
暂无
中图分类号:
TL [原子能技术];
O571 [原子核物理学];
学科分类号:
0827 ;
082701 ;
摘要:
This paper summarizes the status of the ITER blanket system design and describes some of the key R&D activities in support of the design with the goal of starting procurement in the first half of 2013.
引用
收藏
页数:6
相关论文