Design of the ITER First Wall and Blanket

被引:0
|
作者
Raffray, A. Rene [1 ]
Merola, Mario [1 ]
机构
[1] ITER Org, TKM, Internal Components Div, 524-026 Route Vinon Verdon, F-13115 St Paul Les Durance, France
来源
2011 IEEE/NPSS 24TH SYMPOSIUM ON FUSION ENGINEERING (SOFE) | 2011年
关键词
ITER; blanket system; first wall; PLASMA-FACING COMPONENTS;
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
This paper summarizes the status of the ITER blanket system design and describes some of the key R&D activities in support of the design with the goal of starting procurement in the first half of 2013.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Design evaluation of the semi-prototype for the ITER blanket first wall qualification
    Lee, Dong Won
    Bae, Young Dug
    Kim, Suk Kwon
    Kim, Sun Ho
    Hong, Bong Guen
    Bang, In Cheol
    THIN SOLID FILMS, 2010, 518 (22) : 6676 - 6681
  • [2] EU contribution to the procurement of the ITER blanket first wall
    Lorenzetto, Patrick
    Banetta, Stefano
    Bellin, Boris
    Boireau, Bruno
    Bucci, Philippe
    Cicero, Tindaro
    Conchon, Denis
    Dellopoulos, Georges
    Hardaker, Stephen
    Marshall, Paul
    Nogue, Patrice
    Perez, Marcos
    Ruiz Gutierrez, Leticia
    Samaniego, Fernando
    Sherlock, Paul
    Zacchia, Francesco
    FUSION ENGINEERING AND DESIGN, 2016, 109 : 661 - 665
  • [3] The ITER blanket system design challenge
    Raffray, A. R.
    Calcagno, B.
    Chappuis, P.
    Fu, Zhang
    Furmanek, A.
    Chen Jiming
    Kim, D-H.
    Khomiakov, S.
    Labusov, A.
    Martin, A.
    Merola, M.
    Mitteau, R.
    Sadakov, S.
    Ulrickson, M.
    Zacchia, F.
    NUCLEAR FUSION, 2014, 54 (03)
  • [4] R&D ACTIVITIES REGARDING ITER BLANKET FIRST WALL IN KOREA
    Kim, B. Y.
    Ahn, H. J.
    Bak, J. S.
    Kim, S. K.
    Lee, D. W.
    FUSION SCIENCE AND TECHNOLOGY, 2012, 62 (01) : 21 - 28
  • [5] Progress in development and qualification of beryllium for ITER blanket first wall application in Russian Federation
    Kupriyanov, I. B.
    Nikolaev, G. N.
    Gorayev, G.
    FUSION ENGINEERING AND DESIGN, 2017, 124 : 1004 - 1010
  • [6] EU contribution to the procurement of blanket first wall and divertor components for ITER
    Lorenzetto, Patrick
    Andrade, Jose
    Banetta, Stefano
    Cicero, Tindaro
    Dellopoulos, Georges
    Durocher, Alain
    Escourbiac, Frederic
    Felip, Montse
    Ferrand, Laurent
    Gavila, Pierre
    Gicquel, Stefan
    Guerrini, Laurent
    Heikkinen, Samuli
    Marshall, Paul
    Merola, Mario
    Mitteau, Raphael
    Raffray, Rene
    Riccardi, Bruno
    FUSION ENGINEERING AND DESIGN, 2018, 136 : 975 - 982
  • [7] Heat loads and shape design of the ITER first wall
    Mitteau, R.
    Stangeby, P.
    Lowry, C.
    Merola, M.
    FUSION ENGINEERING AND DESIGN, 2010, 85 (10-12) : 2049 - 2053
  • [8] The design of the ITER first wall panels
    Mitteau, R.
    Calcagno, B.
    Chappuis, P.
    Eaton, R.
    Gicquel, S.
    Chen, J.
    Labusov, A.
    Martin, A.
    Merola, M.
    Raffray, R.
    Ulrickson, M.
    Zacchia, F.
    FUSION ENGINEERING AND DESIGN, 2013, 88 (6-8) : 568 - 570
  • [9] Overview of the design and R&D of the ITER blanket system
    Raffray, A. Rene
    Merola, Mario
    FUSION ENGINEERING AND DESIGN, 2012, 87 (5-6) : 769 - 776
  • [10] Thermo-hydraulic and structural analysis for finger-based concept of ITER blanket first wall
    Kim, Byoung-Yoon
    Ahn, Hee-Jae
    FUSION ENGINEERING AND DESIGN, 2011, 86 (9-11) : 1997 - 2002