Risk assessment in straw-based power generation public-private partnership projects in China: A fuzzy synthetic evaluation analysis

被引:98
作者
Wu, Yunna [1 ,2 ]
Li, Lingwenying [1 ,2 ]
Xu, Ruhang [1 ,2 ]
Chen, Kaifeng [1 ,2 ]
Hu, Yong [1 ,2 ]
Lin, Xiaoshan [1 ,2 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing, Peoples R China
[2] North China Elect Power Univ, Beijing Key Lab New Energy & Low Carbon Dev, Beijing 102206, Peoples R China
关键词
PPP mode; Straw-based power generation; Risk assessment; Fuzzy synthetic evaluation; LIFE-CYCLE ASSESSMENT; SUPPLY CHAIN; INFRASTRUCTURE PROJECTS; PERFORMANCE EVALUATION; ENERGY PROJECTS; PPP PROJECTS; ALLOCATION; MALAYSIA; SUCCESS; CHALLENGES;
D O I
10.1016/j.jclepro.2017.06.008
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With the increasing requirement on energy saving, emission reduction and environmental protection in China, the straw-based power generation is developing rapidly, which can not only provide clean energy, but also address the serious environmental problems caused by farmers' burning straw directly. Currently, the government is gradually applying Public-Private-Partnership model to this field making use of private sectors' capital and technological advantages. To assess the risks in public-private partnership straw-based power generation projects in China, 44 risk factors were identified and 19 critical risks factors (CRFs) were selected and classified into 4 groups (CRGs) based on a questionnaire survey in this paper. Then, the likelihood of occurrence (LO), magnitude of impact (MI), the integrated risk level (IRL) of each CRF, CRG and the overall risk were calculated through the fuzzy synthetic evaluation method. The CRF "government invention" was the most critical risk factor and the CRG "project participant risk" was the most critical risk factor group. Overall, the final fuzzy synthesis result indicated that the IRL of the public-private partnership straw-based power generation projects in China was high. Finally, some recommendations were given for each CRF. The evaluation index system, the multi-criteria fuzzy synthetic evaluation framework, the obtained conclusions and the risk response measures in this paper can help policy makers and project decision makers make appropriate decisions and allocate the limited resources to the risks worthy more attention. Simultaneously, this paper can provide a reference for the private sector to avoid too risky project and at the same time facilitate the public sector to take effective measures reducing project risks so as to attract more high-quality private capital. In addition, the risk assessment in public-private partnership straw-based power generation projects has not been discussed and paid enough attention yet. Thus, this study expands the knowledge and contributes to the literature. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:977 / 990
页数:14
相关论文
共 45 条
[31]   Group multi-criteria design concept evaluation using combined rough set theory and fuzzy set theory [J].
Shidpour, Hesam ;
Da Cunha, Catherine ;
Bernard, Alain .
EXPERT SYSTEMS WITH APPLICATIONS, 2016, 64 :633-644
[32]   Risk identification for PPP waste-to-energy incineration projects in China [J].
Song, Jinbo ;
Song, Danrong ;
Zhang, Xueqing ;
Sun, Yan .
ENERGY POLICY, 2013, 61 :953-962
[33]   Sustainable PPPs: A comparative approach for road infrastructure [J].
Villalba-Romero, Felix ;
Liyanage, Champika ;
Roumboutsos, Athena .
CASE STUDIES ON TRANSPORT POLICY, 2015, 3 (02) :243-250
[34]   A synthetic method for knowledge management performance evaluation based on triangular fuzzy number and group support systems [J].
Wang, Jun ;
Ding, Dan ;
Liu, Ou ;
Li, Ming .
APPLIED SOFT COMPUTING, 2016, 39 :11-20
[35]   A design of straw acquisition mode for China's straw power plant based on supply chain coordination [J].
Wen, Wen ;
Zhang, Qin .
RENEWABLE ENERGY, 2015, 76 :369-374
[36]   Critical risk factors affecting the implementation of PPP waste-to-energy projects in China [J].
Xu, Yelin ;
Chan, Albert P. C. ;
Xia, Bo ;
Qian, Queena K. ;
Liu, Yong ;
Peng, Yi .
APPLIED ENERGY, 2015, 158 :403-411
[37]   Developing a risk assessment model for PPP projects in China - A fuzzy synthetic evaluation approach [J].
Xu, Yelin ;
Yeung, John F. Y. ;
Chan, Albert P. C. ;
Chan, Daniel W. M. ;
Wang, Shou Qing ;
Ke, Yongjian .
AUTOMATION IN CONSTRUCTION, 2010, 19 (07) :929-943
[38]   Study on government subsidy decision-making of straw power generation supply chain [J].
Xue, Chaogai ;
Wang, Xinfeng .
13TH GLOBAL CONGRESS ON MANUFACTURING AND MANAGEMENT, 2017, 174 :211-218
[39]   Cost Analysis of straw-based power generation in Jiangsu Province, China [J].
Zhang, Qin ;
Zhou, Dequn ;
Zhou, Peng ;
Ding, Hao .
APPLIED ENERGY, 2013, 102 :785-793
[40]   Critical review on PPP Research - A search from the Chinese and International Journals [J].
Zhang, Shang ;
Chan, Albert P. C. ;
Feng, Yingbin ;
Duan, Hongxia ;
Ke, Yongjian .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (04) :597-612