Risk assessment in straw-based power generation public-private partnership projects in China: A fuzzy synthetic evaluation analysis

被引:93
|
作者
Wu, Yunna [1 ,2 ]
Li, Lingwenying [1 ,2 ]
Xu, Ruhang [1 ,2 ]
Chen, Kaifeng [1 ,2 ]
Hu, Yong [1 ,2 ]
Lin, Xiaoshan [1 ,2 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing, Peoples R China
[2] North China Elect Power Univ, Beijing Key Lab New Energy & Low Carbon Dev, Beijing 102206, Peoples R China
关键词
PPP mode; Straw-based power generation; Risk assessment; Fuzzy synthetic evaluation; LIFE-CYCLE ASSESSMENT; SUPPLY CHAIN; INFRASTRUCTURE PROJECTS; PERFORMANCE EVALUATION; ENERGY PROJECTS; PPP PROJECTS; ALLOCATION; MALAYSIA; SUCCESS; CHALLENGES;
D O I
10.1016/j.jclepro.2017.06.008
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With the increasing requirement on energy saving, emission reduction and environmental protection in China, the straw-based power generation is developing rapidly, which can not only provide clean energy, but also address the serious environmental problems caused by farmers' burning straw directly. Currently, the government is gradually applying Public-Private-Partnership model to this field making use of private sectors' capital and technological advantages. To assess the risks in public-private partnership straw-based power generation projects in China, 44 risk factors were identified and 19 critical risks factors (CRFs) were selected and classified into 4 groups (CRGs) based on a questionnaire survey in this paper. Then, the likelihood of occurrence (LO), magnitude of impact (MI), the integrated risk level (IRL) of each CRF, CRG and the overall risk were calculated through the fuzzy synthetic evaluation method. The CRF "government invention" was the most critical risk factor and the CRG "project participant risk" was the most critical risk factor group. Overall, the final fuzzy synthesis result indicated that the IRL of the public-private partnership straw-based power generation projects in China was high. Finally, some recommendations were given for each CRF. The evaluation index system, the multi-criteria fuzzy synthetic evaluation framework, the obtained conclusions and the risk response measures in this paper can help policy makers and project decision makers make appropriate decisions and allocate the limited resources to the risks worthy more attention. Simultaneously, this paper can provide a reference for the private sector to avoid too risky project and at the same time facilitate the public sector to take effective measures reducing project risks so as to attract more high-quality private capital. In addition, the risk assessment in public-private partnership straw-based power generation projects has not been discussed and paid enough attention yet. Thus, this study expands the knowledge and contributes to the literature. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:977 / 990
页数:14
相关论文
共 50 条
  • [1] Performance risk assessment in public-private partnership projects based on adaptive fuzzy cognitive map
    Chen, Hongyu
    Zhang, Limao
    Wu, Xianguo
    APPLIED SOFT COMPUTING, 2020, 93
  • [2] Risk Misallocation in Public-Private Partnership Projects in China
    Ke, Yongjian
    Wang, Shouqing
    Chan, Albert P. C.
    INTERNATIONAL PUBLIC MANAGEMENT JOURNAL, 2013, 16 (03) : 438 - 460
  • [3] Risk assessment of public-private partnership in Russia based on the fuzzy logic method
    Savrukov, A. N.
    Savrukov, N. T.
    Kozlovskaya, E. A.
    VOPROSY EKONOMIKI, 2020, (10): : 132 - 143
  • [4] Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach
    Ameyaw, Effah Ernest
    Chan, Albert P. C.
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (12) : 5102 - 5116
  • [5] Fuzzy Synthetic Evaluation of the Critical Success Factors for the Sustainability of Public Private Partnership Projects in China
    Deng, Binchao
    Zhou, Dongjie
    Zhao, Jiachen
    Yin, Yilin
    Li, Xiaoyu
    SUSTAINABILITY, 2021, 13 (05) : 1 - 21
  • [6] Fuzzy Integral-Based Risk-Assessment Approach for Public-Private Partnership Infrastructure Projects
    Mazher, Khwaja Mateen
    Chan, Albert P. C.
    Zahoor, Hafiz
    Khan, Mohsen Islam
    Ameyaw, Ernest Effah
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (12)
  • [7] A new rough cloud AHP method for risk evaluation of public-private partnership projects
    Song, Wenyan
    Zhu, Yue
    Zhou, Jianbo
    Chen, Zhiyu
    Zhou, Jiantao
    SOFT COMPUTING, 2022, 26 (04) : 2045 - 2062
  • [8] Empirical Study of Risk Assessment and Allocation of Public-Private Partnership Projects in China
    Chan, Albert P. C.
    Yeung, John F. Y.
    Yu, Calvin C. P.
    Wang, Shou Qing
    Ke, Yongjian
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2011, 27 (03) : 136 - 148
  • [9] Fiscal Risk Management of Public-Private Partnership Projects: A Multidimensional Identification and Assessment Framework
    Xu, LiPing
    Liu, Ning
    Zhou, Linyu
    Lu, LanQi
    ENGINEERING MANAGEMENT JOURNAL, 2024, 36 (02) : 166 - 192
  • [10] Risk evaluation of electric vehicle charging infrastructure public-private partnership projects in China using fuzzy TOPSIS
    Liu, Jicheng
    Wei, Qiushuang
    JOURNAL OF CLEANER PRODUCTION, 2018, 189 : 211 - 222