Simulation Analysis of Subway Station Assemble Capacity on the Layout of Facilities

被引:0
作者
Liu, Meng-Jie [1 ]
Zeng, Tie-Mei [2 ]
Wu, Xian-Guo [1 ]
Zhang, Li-Mao [1 ,3 ]
Fang, Wei-Li [1 ]
机构
[1] Huazhong Univ Sci & Technol, Wuhan 430074, Peoples R China
[2] Wuhan Metro Grp Co Ltd, Wuhan 430030, Peoples R China
[3] Univ Alberta, Edmonton, AB T6G 2G7, Canada
来源
International Conference on Mechanics, Building Material and Civil Engineering (MBMCE 2015) | 2015年
关键词
Subway Station; Layout of Facility; Assemble Capability; Anylogic;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Problems in subway station operation mainly exist at the place with service facilities, in this paper, Anylogic is used to simulate the assemble capacity under different layout of facilities. Pedestrian density, flow rate, service times and maximum arriving rate are selected to be the evaluations. The Hongshan Square Station is select for case study, the simulation is within an hour, analyzing from pedestrian density distribution map, flow rate chart of key points, service times of critical facilities and the maximum passenger arriving rate values, get the result that the assemble capacity is poor under current conditions, and the improvement measures are put forward. With these recommendations, assemble capacity of this station is obviously improved. This method can provide valuable theoretic and practical insights into the management of the layout of facilities, therefore, the optimization of assemble capacity can further be achieved in metro station.
引用
收藏
页码:971 / 976
页数:6
相关论文
共 6 条
  • [1] CHEN H, 2012, INTERACTION DESIGN M, V15, P45
  • [2] [丁烈云 Ding Lieyun], 2011, [土木工程学报, China Civil Engineering Journal], V44, P121
  • [3] Ghosh S., 2004, International Journal of Project Management, V22, P633, DOI 10.1016/j.ijproman.2004.05.004
  • [4] JIA HF, 2009, J TRANSPORTATION SYS, V9, P1034
  • [5] LIU TT, 2015, J CHONGQING JIAOTONG, V34, P98
  • [6] WAN H, 2010, FIRE SCI TECHNOLOGY, V29, P745