Study on the Construction Project Scheduling and Management Mode from the Perspective of Collaborative Management and Process Optimization

被引:0
作者
Song Aiping [1 ]
机构
[1] Yunnan Coll Business Management, Kunming 650300, Yunnan, Peoples R China
来源
INTERNATIONAL SYMPOSIUM 2017 - MECHANICAL AND ELECTRONICAL SYSTEMS AND CONTROL ENGINEERING | 2017年
关键词
Construction project; Scheduling and management mode; Defects analysis;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
From the stance of project schedule management, this paper summarizes main schedule management models that are suitable for engineering projects and the applicable conditions of various models. Taken the network planning technology as a representative, the main defects of the existing schedule management model are analyzed, which can provide reference for the development of project schedule management.
引用
收藏
页码:84 / 88
页数:5
相关论文
共 6 条
[1]  
Abdullah MR, 2009, DELAY LARGE MARA CON
[2]  
Kartam N.A., 2001, INT J OFPROJECT MANA, V19, P325, DOI DOI 10.1016/S0263-7863(00)00014-4
[3]  
Mahamid I., 2013, J CONSTRUCTION PROJE
[4]   Collaborative activities in virtual settings: A knowledge management perspective of telemedicine [J].
Paul, DL .
JOURNAL OF MANAGEMENT INFORMATION SYSTEMS, 2006, 22 (04) :143-176
[5]   Managing construction project change: a knowledge management perspective [J].
Senaratne, Sepani ;
Sexton, Martin .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (12) :1303-1311
[6]  
Son JW, 2013, J KOREA SOC SYSTEMS