Prospects of hydropower for electricity generation in the East Region of Cameroon

被引:3
作者
Kidmo, Dieudonne Kaoga [1 ]
Bogno, Bachirou [2 ,3 ,4 ]
Deli, Kodji [1 ]
Nsouandele, Jean Luc Dit Bouerdjila [1 ]
Aillerie, Michel [3 ,4 ]
机构
[1] Univ Maroua, Natl Adv Sch Engn, Dept Renewable Energy, POB 46, Maroua, Cameroon
[2] Univ Maroua, Dept Phys, Higher Teachers Training Coll, POB 46, Maroua, Cameroon
[3] Univ Lorraine, LMOPS, EA 4423, F-57070 Metz, France
[4] CentraleSupelec, LMOPS, F-57070 Metz, France
关键词
Hydrologic data; Hydropower; Flow rate; Power; Hydroelectric plant; East Region; Cameroon; RENEWABLE ENERGY;
D O I
10.1016/j.egyr.2021.07.062
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Currently, households in the East Region of Cameroon (ERoC) depend solely on fossil-fueled plants to meet their energy needs. Fossil fuel-based sources are a major drain on public finance in addition to being a key contributor to the increase in carbon footprints. Alternatively, the ERoC is blessed with a hydropower potential estimated at around 620.37 MW, with a production potential of 5.36 TWh per year. However, despite its favorable candidates' sites, hydropower resources are yet to be harnessed in the ERoC. Hence, the need for a thorough assessment of hydropower potential is necessary in order to increase stakeholders' awareness and interest in attractive hydropower resources. This paper evaluates and highlights the hydropower potential of seven selected locations in the ERoC and contributes to constituting a database for the stakeholders of the hydropower resources for electricity generation. Specifically, hydrological data, mean flow rates and mean volume contributions on each site's river basin are explored. Furthermore, the present work highlights optimal regulation ratios, nominal flow rates, producible energy, investment costs as well as other useful parameters for projected hydropower plants for the seven selected locations in the ERoC. The results display a cumulative projected capacity of 582 MW, of which 19 MW from Zoukoumanbale, 18 MW from Colomines, 53 MW from Zoulabot, 297 MW from Nki falls, 129 MW from Yenga, 35 MW from Bangue and 124 MW from Ngoila. Moreover, 3 929 GWh are projected cumulative producible energy for the selected locations. Investment costs estimates of hydroelectric plants range between 2964 (sic) per kW (for Colomines) and 3002 (sic) per kW (for Bangue). (C) 2021 The Author(s). Published by Elsevier Ltd.
引用
收藏
页码:780 / 797
页数:18
相关论文
共 30 条
  • [1] Renewable energy sources in Cameroon: Potentials, benefits and enabling environment
    Abanda, F. H.
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2012, 16 (07) : 4557 - 4562
  • [2] Challenges and prospects of Nigeria's sustainable energy transition with lessons from other countries' experiences
    Adewuyi, Oludamilare Bode
    Kiptoo, Mark Kipngetich
    Afolayan, Ayodeji Fisayo
    Amara, Theophilus
    Alawode, Oluwatobi Idowu
    Senjyu, Tomonobu
    [J]. ENERGY REPORTS, 2020, 6 : 993 - 1009
  • [3] The Design of High Efficiency Crossflow Hydro Turbines: A Review and Extension
    Adhikari, Ram
    Wood, David
    [J]. ENERGIES, 2018, 11 (02)
  • [4] [Anonymous], 2004, SURV EN RES
  • [5] Bertrand E, 2017, J. Power Energy Eng, V5, P64, DOI [10.4236/jpee.2017.59006, DOI 10.4236/JPEE.2017.59006]
  • [6] Biondic D, 2007, PREDICT UNGAUGED BAS, V309, P221
  • [7] Operation, performance and economic analysis of low head micro-hydropower turbines for rural and remote areas: A review
    Elbatran, A. H.
    Yaakob, O. B.
    Ahmed, Yasser M.
    Shabara, H. M.
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2015, 43 : 40 - 50
  • [8] Assessment of mini and micro hydropower potential in Egypt: Multi-criteria analysis
    Eshra, Nadia M.
    Zobaa, Ahmed F.
    Aleem, Shady H. E. Abdel
    [J]. ENERGY REPORTS, 2021, 7 : 81 - 94
  • [9] Eutyche D, 2020, JPEE, V8, P37, DOI [10.4236/jpee.2020.88003, DOI 10.4236/JPEE.2020.88003]
  • [10] Hans Braxmeier, 2021, SANGHA RIVER BASIN 2