Controlled blasting in underground construction: A case study of a tunnel plug demolition in the Neelum Jhelum hydroelectric project

被引:44
作者
Sharafat, Abubakar [1 ,3 ]
Tanoli, Waqas Arshad [1 ,4 ]
Raptis, Georgios [2 ,3 ]
Seo, Jong Won [1 ]
机构
[1] Hanyang Univ, Dept Civil & Environm Engn, Seoul 04763, South Korea
[2] Independent Geol Engn Serv, Kadirler Sok 7-2, TR-48640 Ula, Mugla, Turkey
[3] Neelum Jhelum Consultants, Malik House,Lower Chatter Rd, Muzaffarabad, Ajk, Pakistan
[4] Commun & Works Dept, Khyber Pakhtunkhwa, Pakistan
基金
新加坡国家研究基金会;
关键词
Controlled blasting; Critical particle velocity; Vibration attenuation model; Permissible instantaneous charge weight; Blasting damage; Tunneling through major fault; 2005; KASHMIR; ROCK; PREDICTION; DAMAGE;
D O I
10.1016/j.tust.2019.103098
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Blasting is a popular method of excavation in underground construction. Blast-induced vibrations, however, if not properly controlled, can negatively affect the rock mass surrounding the tunnel. During the drill-and-blast (D&B) excavation of twin headrace tunnels through a major fault zone below the Jhelum River, a 180-m(3)/h groundwater inflow occurred from the tunnel invert. A 610-m(3) concrete plug and high-pressure grouting around the tunnel periphery were formed to stabilize the tunnel and control inflow. To complete the tunnel, the temporary tunnel plug was ultimately demolished using controlled blasting. Ground vibration monitoring data from the regular D&B operations were used to develop a site-specific vibration attenuation model. Using geotechnical data from the feasibility stage and tunnel mappings during construction, a critical particle velocity above which tensile cracking could be initiated was determined for the rock mass surrounding the plug. The critical particle velocity was incorporated into the vibration attenuation model to obtain permissible charge weights to limit blast damage to within a short distance from the charge. Using this approach, an innovative blasting pattern was adopted in which the tunnel plug was sequentially demolished by detonating a burn cut and separate contour blast rows. During blasting, rigorous supervision and data collection helped to record, evaluate, and when needed, adjust the blasting program. Overall, the tunnel plug demolition was completed in a safe and cost-effective manner.
引用
收藏
页数:18
相关论文
共 41 条
[1]   Vibration vulnerability of shotcrete on tunnel walls during construction blasting [J].
Ahmed, Lamis ;
Ansell, Anders .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2014, 42 :105-111
[2]  
[Anonymous], ISEE FIELD PRACT GUI
[3]  
[Anonymous], P 12 INT C GROUND CO
[4]  
[Anonymous], 3 INT C STAB SURF MI
[5]  
[Anonymous], P INT S LARG SCAL UN
[6]  
[Anonymous], WAB 80 NITR BAS DYN
[7]  
[Anonymous], THESIS
[8]  
[Anonymous], CONTROLLED BLASTING
[9]  
[Anonymous], OPEN PIT BLASTING SE
[10]  
[Anonymous], T I MIN METALL